HTS Heading 2707

Oils and other products of the distillation of high temperature coal tar; similar products in which the weight of the aromatic constituents exceeds that of the nonaromatic constituents

All 17 HTS codes under heading 2707 (oils and other products), with their duty rates from the 2026 HTS Revision 23. General duty Free to 12.5%, some per unit.

Every line of heading 2707

  • 2707 Oils and other products of the distillation of high temperature coal tar; similar products in which the weight of the aromatic constituents exceeds that of the nonaromatic constituents.
  • 2707.10.00.00 Benzene (under: Oils and other products of the distillation of high temperature coal tar; similar products in which the weight of the aromatic constituents exceeds that of the nonaromatic constituents) (liters): General Free; Special none; Column 2 Free.
  • 2707.20.00.00 Toluene (under: Oils and other products of the distillation of high temperature coal tar; similar products in which the weight of the aromatic constituents exceeds that of the nonaromatic constituents) (liters): General Free; Special none; Column 2 Free.
  • 2707.30.00 Xylenes (under: Oils and other products of the distillation of high temperature coal tar; similar products in which the weight of the aromatic constituents exceeds that of the nonaromatic constituents): General Free; Special none; Column 2 Free.
  • 2707.30.00.10 m-Xylene (under: Xylenes) (liters).
  • 2707.30.00.20 o-Xylene (under: Xylenes) (liters).
  • 2707.30.00.30 p-Xylene (under: Xylenes) (liters).
  • 2707.30.00.40 Other (under: Xylenes) (liters).
  • 2707.40.00.00 Naphthalene (under: Oils and other products of the distillation of high temperature coal tar; similar products in which the weight of the aromatic constituents exceeds that of the nonaromatic constituents) (kg, liters): General Free; Special none; Column 2 Free.
  • 2707.50.00.00 Other aromatic hydrocarbon mixtures of which 65 percent or more by volume (including losses) distills at 250˚C by the ISO 3405 method (equivalent to the ASTM D 86 method) (kg, liters): General Free; Special none; Column 2 Free.
  • 2707.91.00.00 Creosote oils (under: Other) (liters): General Free; Special none; Column 2 Free.
  • 2707.99 Other (under: Other).
  • 2707.99.10.00 Light oil (under: Other) (liters): General Free; Special none; Column 2 Free.
  • 2707.99.20.00 Picolines (under: Other) (kg): General Free; Special none; Column 2 Free.
  • 2707.99.40.00 Carbazole having a purity of 65 percent or more by weight (kg): General 0.9¢/kg + 3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,L,MA,OM,P,PA,PE,S,SG); Column 2 15.4¢/kg +40%.
  • 2707.99.51.00 Containing more than 50 percent by weight of hydroxybenzene (kg): General 2.9¢/kg + 12.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 7.7¢/kg + 29.5%.
  • 2707.99.55.00 Metacresol, orthocresol, paracresol and metaparacresol, all the foregoing having a purity of 75 percent or more by weight (kg): General 0.9¢/kg + 3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 15.4¢/kg + 42.5%.
  • 2707.99.59.00 Other (under: Phenols) (kg): General Free; Special none; Column 2 Free.
  • 2707.99.90 Other (under: Other): General Free; Special none; Column 2 Free.
  • 2707.99.90.10 Carbon black feedstocks (under: Other) (bbl).
  • 2707.99.90.90 Other (under: Other) (kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.