HTS Heading 2708
Pitch and pitch coke, obtained from coal tar or from other mineral tars
All 2 HTS codes under heading 2708 (pitch and pitch coke), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 2708
- 2708 Pitch and pitch coke, obtained from coal tar or from other mineral tars.
- 2708.10.00.00 Pitch (under: Pitch and pitch coke, obtained from coal tar or from other mineral tars) (kg): General Free; Special none; Column 2 Free.
- 2708.20.00.00 Pitch coke (under: Pitch and pitch coke, obtained from coal tar or from other mineral tars) (kg): General Free; Special none; Column 2 Free.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.