HTS Heading 2710
Petroleum oils and oils obtained from bituminous minerals, other than crude; preparations not elsewhere specified or included, containing by weight 70 percent or more of petroleum oils or of oils obtained from bituminous minerals, these oils being the basic constituents of the preparations; waste oils
All 76 HTS codes under heading 2710 (petroleum oils), with their duty rates from the 2026 HTS Revision 23. General duty Free to 7%, some per unit.
Every line of heading 2710
- 2710 Petroleum oils and oils obtained from bituminous minerals, other than crude; preparations not elsewhere specified or included, containing by weight 70 percent or more of petroleum oils or of oils obtained from bituminous minerals, these oils being the basic constituents of the preparations; waste oils.
- 2710.12 Light oils and preparations (under: Petroleum oils and oils obtained from bituminous minerals (other than crude) and preparations not elsewhere specified or included, containing by weight 70 percent or more of petroleum oils or of oils obtained from bituminous minerals, these oils being the basic constituents of the preparations, other than those containing biodiesel and other than waste oils).
- 2710.12.15 Motor fuel (under: Light oils and preparations): General 52.5¢/bbl; Special Free (A+,AU,BH,CL,CO,D, IL,JO, KR,MA,OM,P, PA,PE,R,S,SG); Column 2 $1.05/bbl.
- 2710.12.15.10 Leaded (under: Gasoline) (bbl).
- 2710.12.15.14 Reformulated (under: Unleaded) (bbl).
- 2710.12.15.19 Other (under: Unleaded) (bbl).
- 2710.12.15.20 Jet fuel, naphtha-type (under: Motor fuel) (bbl).
- 2710.12.15.50 Other (under: Motor fuel) (bbl).
- 2710.12.18 Motor fuel blending stock (under: Light oils and preparations): General 52.5¢/bbl; Special Free (A+,AU,BH,CL,CO,D, IL,JO, KR,MA,OM,P, PA,PE,R,S,SG); Column 2 $1.05/bbl.
- 2710.12.18.05 Reformulated blendstock for oxygenate blending (RBOB) (bbl).
- 2710.12.18.90 Other (under: Motor fuel blending stock) (bbl).
- 2710.12.25.00 Naphthas (except motor fuel or motor fuel blending stock) (bbl): General 10.5¢/bbl; Special Free (A+,AU,BH,CL,CO,D, IL,JO, KR,MA,OM,P, PA,PE,R,S,SG); Column 2 21¢/bbl.
- 2710.12.45 Mixtures of hydrocarbons not elsewhere specified or included, which contain by weight not over 50 percent of any single hydrocarbon compound: General 10.5¢/bbl; Special Free (A+,AU,BH,CL,CO,D, IL,JO, KR,MA,OM,P, PA,PE,R,S,SG); Column 2 21¢/bbl.
- 2710.12.45.45 Insulating or transformer oils (bbl).
- 2710.12.45.60 Renewable fuels blends containing not less than 51 percent by volume of biofuel, as described in statistical note 1 to this chapter (bbl).
- 2710.12.45.95 Other (under: Mixtures of hydrocarbons not elsewhere specified or included, which contain by weight not over 50 percent of any single hydrocarbon compound) (bbl).
- 2710.12.90.00 Other (under: Other) (kg, liters): General 7%; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO, KR,MA,OM,P, PA,PE,S,SG); Column 2 25%.
- 2710.19 Other (under: Petroleum oils and oils obtained from bituminous minerals (other than crude) and preparations not elsewhere specified or included, containing by weight 70 percent or more of petroleum oils or of oils obtained from bituminous minerals, these oils being the basic constituents of the preparations, other than those containing biodiesel and other than waste oils).
- 2710.19.06 Testing under 25 degrees A.P.I.: General 5.25¢/bbl; Special Free (A+,AU,BH,CL,CO,D, IL,JO, KR,MA,OM,P, PA,PE,R,S,SG); Column 2 21¢/bbl.
- 2710.19.06.05 Containing not more than 500 ppm of sulfur (bbl).
- 2710.19.06.15 Containing more than 500 ppm of sulfur (bbl).
- 2710.19.06.25 Fuel oil No. 5 (under: Having a Saybolt Universal viscosity at 37.8˚C of more than 125 seconds (heavy fuel oils)) (bbl).
- 2710.19.06.30 Fuel oil No. 6 (under: Having a Saybolt Universal viscosity at 37.8˚C of more than 125 seconds (heavy fuel oils)) (bbl).
- 2710.19.06.35 Other (under: Having a Saybolt Universal viscosity at 37.8˚C of more than 125 seconds (heavy fuel oils)) (bbl).
- 2710.19.06.50 Other (under: Testing under 25 degrees A.P.I.) (bbl).
- 2710.19.11 Testing 25 degrees A.P.I. or more: General 10.5¢/bbl; Special Free (A+,AU,BH,CL,CO,D, IL,JO, KR,MA,OM,P, PA,PE,R,S,SG); Column 2 21¢/bbl.
- 2710.19.11.02 Containing not more than 15 ppm of sulfur (bbl).
- 2710.19.11.03 Containing more than 15 ppm but not more than 500 ppm of sulfur (bbl).
- 2710.19.11.04 Containing more than 500 ppm of sulfur (bbl).
- 2710.19.11.05 Containing not more than 15 ppm of sulfur (bbl).
- 2710.19.11.07 Containing more than 15 ppm but not more than 500 ppm of sulfur (bbl).
- 2710.19.11.08 Containing more than 500 ppm of sulfur (bbl).
- 2710.19.11.11 Containing not more than 15 ppm of sulfur (bbl).
- 2710.19.11.13 Containing more than 15 ppm but not more than 500 ppm of sulfur (bbl).
- 2710.19.11.14 Containing more than 500 ppm of sulfur (bbl).
- 2710.19.11.15 Containing not more than 500 ppm of sulfur (bbl).
- 2710.19.11.25 Containing more than 500 ppm of sulfur (bbl).
- 2710.19.11.50 Having a Saybolt Universal viscosity at 37.8˚C of more than 125 seconds (heavy fuel oils) (bbl).
- 2710.19.16.00 Kerosene-type jet fuel (under: Other) (bbl): General 52.5¢/bbl; Special Free (A+,AU,BH,CL,CO,D, IL,JO, KR,MA,OM,P, PA,PE,R,S,SG); Column 2 $1.05/bbl.
- 2710.19.24.00 Motor fuel (under: Kerosene (except kerosene-type jet fuel)) (bbl): General 52.5¢/bbl; Special Free (A+,AU,BH,CL,CO,D, IL,JO, KR,MA,OM,P, PA,PE,R,S,SG); Column 2 $1.05/bbl.
- 2710.19.25.00 Motor fuel blending stock (under: Kerosene (except kerosene-type jet fuel)) (bbl): General 52.5¢/bbl; Special Free (A+,AU,BH,CL,CO,D, IL,JO, KR,MA,OM,P, PA,PE,R,S,SG); Column 2 $1.05/bbl.
- 2710.19.26.00 Kerosene (except kerosene-type jet fuel (bbl): General 10.5¢/bbl; Special Free (A+,AU,BH,CL,CO,D, IL,JO, KR,MA,OM,P, PA,PE,R,S,SG); Column 2 21¢/bbl.
- 2710.19.30 Oils (under: Lubricating oils and greases, with or without additives): General 84¢/bbl; Special Free (A+,AU,BH,CL,CO,D, IL,JO, KR,MA,OM,P, PA,PE,R,S,SG); Column 2 $1.68/bbl.
- 2710.19.30.10 Aviation engine lubricating oils (bbl).
- 2710.19.30.20 Automotive, diesel or marine engine lubricating oils (bbl).
- 2710.19.30.30 Turbine lubricating oil, including marine (bbl).
- 2710.19.30.40 Automotive gear oils (under: Oils) (bbl).
- 2710.19.30.50 Steam cylinder oils (under: Oils) (bbl).
- 2710.19.30.70 Quenching or cutting oils (under: Oils) (bbl).
- 2710.19.30.80 Other (under: Oils) (bbl).
- 2710.19.35.00 Containing not over 10 percent by weight of salts of fatty acids of animal (including marine animal) or vegetable origin (kg): General 5.8%; Special Free (A,AU,BH,CL,CO,D,IL,JO,KR,MA,OM,P,PA,PE,R,S,SG); Column 2 20%.
- 2710.19.40.00 Other (under: Greases) (kg): General 1.3¢/kg + 5.7%; Special Free (A,AU,BH,CL,CO,D,IL,JO,KR,MA,OM,P,PA,PE,R,S,SG); Column 2 4.4¢/kg + 20%.
- 2710.19.45 Mixtures of hydrocarbons not elsewhere specified or included, which contain by weight not over 50 percent of any single hydrocarbon compound: General 10.5¢/bbl; Special Free (A+,AU,BH,CL,CO,D, IL,JO, KR,MA,OM,P, PA,PE,R,S,SG); Column 2 21¢/bbl.
- 2710.19.45.30 Medicinal grade (under: White mineral oil) (bbl).
- 2710.19.45.40 Other (under: White mineral oil) (bbl).
- 2710.19.45.45 Insulating or transformer oils (bbl).
- 2710.19.45.90 Other (under: Mixtures of hydrocarbons not elsewhere specified or included, which contain by weight not over 50 percent of any single hydrocarbon compound) (bbl).
- 2710.19.90.00 Other (under: Other) (kg, liters): General 7%; Special Free (A+,AU,BH,CL,CO,D, E,IL,JO, KR,MA,OM,P, PA,PE,S,SG); Column 2 25%.
- 2710.20 Petroleum oils and oils obtained from bituminous minerals (other than crude) and preparations not elsewhere specified or included containing by weight 70 percent or more of petroleum oils or of oils obtained from bituminous minerals, these oils being the basic constituents of the preparations, containing biodiesel, other than waste oils.
- 2710.20.05 Testing under 25 degrees A.P.I.: General 5.25¢/bbl; Special Free (A+,AU,BH,CL,CO,D,IL, JO,KR,MA, OM,P,PA,PE, R,S,SG); Column 2 21¢/bbl.
- 2710.20.05.10 Having a Saybolt Universal viscosity at 37.8˚C of 45 seconds or more but not more than 125 seconds (No. 4-type fuel oils) (bbl).
- 2710.20.05.20 Having a Saybolt Universal viscosity at 37.8˚C of more than 125 seconds (heavy fuel oils) (bbl).
- 2710.20.05.50 Other (under: Testing under 25 degrees A.P.I.) (bbl).
- 2710.20.10 Testing 25 degrees A.P.I. or more: General 10.5¢/bbl; Special Free (A+,AU,BH,CL,CO,D, IL,JO, KR,MA,OM,P, PA,PE,R,S,SG); Column 2 21¢/bbl.
- 2710.20.10.02 Containing not more than 15 ppm of sulfur (bbl).
- 2710.20.10.03 Containing more than 15 ppm but not more than 500 ppm of sulfur (bbl).
- 2710.20.10.04 Containing more than 500 ppm of sulfur (bbl).
- 2710.20.10.05 Containing not more than 15 ppm of sulfur (bbl).
- 2710.20.10.07 Containing more than 15 ppm but not more than 500 ppm of sulfur (bbl).
- 2710.20.10.08 Containing more than 500 ppm of sulfur (bbl).
- 2710.20.10.11 Containing not more than 15 ppm of sulfur (bbl).
- 2710.20.10.13 Containing more than 15 ppm but not more than 500 ppm of sulfur (bbl).
- 2710.20.10.14 Containing more than 500 ppm of sulfur (bbl).
- 2710.20.10.15 Containing not more than 500 ppm of sulfur (bbl).
- 2710.20.10.25 Containing more than 500 ppm of sulfur (bbl).
- 2710.20.10.50 Having a Saybolt Universal viscosity at 37.8˚C of more than 125 seconds (heavy fuel oils) (bbl).
- 2710.20.15.00 Kerosene-type jet fuel, motor fuel or motor fuel blending stock (bbl): General 52.5¢/bbl; Special Free (A+,AU,BH,CL,CO,D, IL,JO, KR,MA,OM,P, PA,PE,R,S,SG); Column 2 $1.05/bbl.
- 2710.20.25.00 Kerosene (except kerosene-type jet fuel, motor fuel or motor fuel blending stock) (bbl): General 10.5¢/bbl; Special Free (A+,AU,BH,CL,CO,D, IL,JO, KR,MA,OM,P, PA,PE,R,S,SG); Column 2 21¢/bbl.
- 2710.91.00 Containing polychlorinated biphenyls (PCBs), polychlorinated terphenyls (PCTs) or polybrominated biphenyls (PBBs): General 10.5¢/bbl; Special Free (A+,AU,BH,CL,CO,D,IL, JO,KR,MA, OM,P,PA,PE, R,S,SG); Column 2 21¢/bbl.
- 2710.91.00.10 Containing polychlorinated biphenyls (PCBs) at a concentration level of 50 mg/kg or more (bbl).
- 2710.91.00.50 Other, containing polychlorinated terphenyls (PCTs) or polybrominated biphenyls (PBBs), whether or not also containing polychlorinated biphenyls (PCBs) at a concentration level of less than 50 mg/kg (bbl).
- 2710.99 Other (under: Waste oils).
- 2710.99.05.00 Testing under 25 degrees A.P.I. (bbl): General 5.25¢/bbl; Special Free (A+,AU,BH,CL,CO,D,IL, JO,KR,MA, OM,P,PA,PE, R,S,SG); Column 2 21¢/bbl.
- 2710.99.10.00 Testing 25 degrees A.P.I. or more (bbl): General 10.5¢/bbl; Special Free (A+,AU,BH,CL,CO,D,IL, JO,KR,MA, OM,P,PA,PE, R,S,SG); Column 2 21¢/bbl.
- 2710.99.16.00 Wastes of motor fuel or of motor fuel blending stock (bbl): General 52.5¢/bbl; Special Free (A+,AU,BH,CL,CO,D,IL, JO,KR,MA, OM,P,PA,PE, R,S,SG); Column 2 $1.05/bbl.
- 2710.99.21.00 Wastes of kerosene or naphthas (bbl): General 10.5¢/bbl; Special Free (A+,AU,BH,CL,CO,D,IL, JO,KR,MA, OM,P,PA,PE, R,S,SG); Column 2 21¢/bbl.
- 2710.99.31.00 Of oils (under: Wastes of lubricating oils and greases (whether or not containing additives)) (bbl): General 84¢/bbl; Special Free (A+,AU,BH,CL,CO,D,IL, JO,KR,MA, OM,P,PA,PE, R,S,SG); Column 2 $1.68/bbl.
- 2710.99.32.00 Containing not over 10 percent by weight of salts of fatty acids of animal (including marine animal) or vegetable origin (kg): General 5.8%; Special Free (A,AU,BH,CL,CO,D,IL,JO,KR,MA,OM,P,PA,PE,R,S,SG); Column 2 20%.
- 2710.99.39.00 Other (under: Of greases) (kg): General 1.3¢/kg + 5.7%; Special Free (A,AU,BH,CL,CO,D,IL,JO,KR,MA,OM,P,PA,PE,R,S,SG); Column 2 4.4¢/kg + 20%.
- 2710.99.45.00 Mixtures of hydrocarbons not elsewhere specified or included, which contain not over 50 percent of any single hydrocarbon compound (bbl): General 10.5¢/bbl; Special Free (A+,AU,BH,CL,CO,D,IL, JO,KR,MA, OM,P,PA,PE, R,S,SG); Column 2 21¢/bbl.
- 2710.99.90.00 Other (under: Other) (kg, liters): General 7%; Special Free (A+,AU,BH,CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 25%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.