HTS Heading 2709
Petroleum oils and oils obtained from bituminous minerals, crude
All 3 HTS codes under heading 2709 (petroleum oils), with their duty rates from the 2026 HTS Revision 23. General duty Free, some per unit.
Every line of heading 2709
- 2709.00 Petroleum oils and oils obtained from bituminous minerals, crude.
- 2709.00.10.00 Testing under 25 degrees A.P.I. (bbl): General 5.25¢/bbl; Special Free (A+,AU,BH,CL,CO,D,IL, JO,KR,MA, OM,P,PA,PE,R,S,SG); Column 2 21¢/bbl.
- 2709.00.20 Testing 25 degrees A.P.I. or more: General 10.5¢/bbl; Special Free (A+,AU,BH,CL,CO,D,IL, JO,KR,MA, OM,P,PA,PE, R,S,SG); Column 2 21¢/bbl.
- 2709.00.20.10 Condensate derived wholly from natural gas (bbl).
- 2709.00.20.90 Other (under: Testing 25 degrees A.P.I. or more) (bbl).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.