HTS Heading 2712
Petroleum jelly; paraffin wax, microcrystalline petroleum wax, slack wax, ozokerite, lignite wax, peat wax, other mineral waxes and similar products obtained by synthesis or by other processes, whether or not colored
All 4 HTS codes under heading 2712 (petroleum jelly), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 2712
- 2712 Petroleum jelly; paraffin wax, microcrystalline petroleum wax, slack wax, ozokerite, lignite wax, peat wax, other mineral waxes and similar products obtained by synthesis or by other processes, whether or not colored.
- 2712.10.00.00 Petroleum jelly (under: Petroleum jelly; paraffin wax, microcrystalline petroleum wax, slack wax, ozokerite, lignite wax, peat wax, other mineral waxes and similar products obtained by synthesis or by other processes, whether or not colored) (kg): General Free; Special none; Column 2 Free.
- 2712.20.00.00 Paraffin wax containing by weight less than 0.75 percent of oil (kg): General Free; Special none; Column 2 2.2¢/kg.
- 2712.90 Other (under: Petroleum jelly; paraffin wax, microcrystalline petroleum wax, slack wax, ozokerite, lignite wax, peat wax, other mineral waxes and similar products obtained by synthesis or by other processes, whether or not colored).
- 2712.90.10.00 Montan wax (under: Other) (kg): General Free; Special none; Column 2 Free.
- 2712.90.20.00 Other (under: Other) (kg): General Free; Special none; Column 2 2.2¢/kg.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.