HTS Heading 2713
Petroleum coke, petroleum bitumen and other residues of petroleum oils or of oils obtained from bituminous minerals
All 4 HTS codes under heading 2713 (petroleum coke), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 2713
- 2713 Petroleum coke, petroleum bitumen and other residues of petroleum oils or of oils obtained from bituminous minerals.
- 2713.11.00.00 Not calcined (under: Petroleum coke) (t): General Free; Special none; Column 2 Free.
- 2713.12.00.00 Calcined (under: Petroleum coke) (t): General Free; Special none; Column 2 45%.
- 2713.20.00.00 Petroleum bitumen (under: Petroleum coke, petroleum bitumen and other residues of petroleum oils or of oils obtained from bituminous minerals) (t): General Free; Special none; Column 2 Free.
- 2713.90.00.00 Other residues of petroleum oils or of oils obtained from bituminous materials (t): General Free; Special none; Column 2 Free.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.