HTS Heading 2814
Ammonia, anhydrous or in aqueous solution
All 2 HTS codes under heading 2814 (ammonia, anhydrous or in aqueous solution), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 2814
- 2814 Ammonia, anhydrous or in aqueous solution.
- 2814.10.00.00 Anhydrous ammonia (under: Ammonia, anhydrous or in aqueous solution) (t): General Free; Special none; Column 2 Free.
- 2814.20.00.00 Ammonia in aqueous solution (under: Ammonia, anhydrous or in aqueous solution) (t, NH3 t): General Free; Special none; Column 2 Free.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.