HTS Heading 2815

Sodium hydroxide (Caustic soda); potassium hydroxide (Caustic potash); peroxides of sodium or potassium

All 5 HTS codes under heading 2815 (sodium hydroxide (Caustic soda)), with their duty rates from the 2026 HTS Revision 23. General duty Free to 3.7%.

Every line of heading 2815

  • 2815 Sodium hydroxide (Caustic soda); potassium hydroxide (Caustic potash); peroxides of sodium or potassium.
  • 2815.11.00.00 Solid (under: Sodium hydroxide (Caustic soda)) (kg): General Free; Special none; Column 2 1.1¢/kg.
  • 2815.12.00.00 In aqueous solution (Soda lye or liquid soda) (kg, NaOH kg): General Free; Special none; Column 2 1.1¢/kg.
  • 2815.20.00 Potassium hydroxide (Caustic potash): General Free; Special none; Column 2 2.2¢/kg.
  • 2815.20.00.50 In solid form (under: Potassium hydroxide (Caustic potash)) (kg).
  • 2815.20.00.90 Other (under: Potassium hydroxide (Caustic potash)) (kg).
  • 2815.30.00.00 Peroxides of sodium or potassium (kg): General 3.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.