HTS Heading 2937
Hormones, prostaglandins, thromboxanes and leukotrienes, natural or reproduced by synthesis; derivatives and structural analogues thereof, including chain modified polypeptides, used primarily as hormones
All 29 HTS codes under heading 2937 (hormones, prostaglandins), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 2937
- 2937 Hormones, prostaglandins, thromboxanes and leukotrienes, natural or reproduced by synthesis; derivatives and structural analogues thereof, including chain modified polypeptides, used primarily as hormones.
- 2937.11.00.00 Somatotropin, its derivatives and structural analogues (g): General Free; Special none; Column 2 10%.
- 2937.12.00.00 Insulin and its salts (under: Polypeptide hormones, protein hormones and glycoprotein hormones, their derivatives and structural analogues) (g): General Free; Special none; Column 2 10%.
- 2937.19.00.00 Other (under: Polypeptide hormones, protein hormones and glycoprotein hormones, their derivatives and structural analogues) (g): General Free; Special none; Column 2 25%.
- 2937.21.00 Cortisone, hydrocortisone, prednisone (dehydrocortisone), and prednisolone (dehydrohydrocortisone): General Free; Special none; Column 2 25%.
- 2937.21.00.10 Cortisone (under: Cortisone, hydrocortisone, prednisone (dehydrocortisone), and prednisolone (dehydrohydrocortisone)) (g).
- 2937.21.00.20 Hydrocortisone (under: Cortisone, hydrocortisone, prednisone (dehydrocortisone), and prednisolone (dehydrohydrocortisone)) (g).
- 2937.21.00.30 Prednisone (under: Cortisone, hydrocortisone, prednisone (dehydrocortisone), and prednisolone (dehydrohydrocortisone)) (g).
- 2937.21.00.40 Prednisolone (under: Cortisone, hydrocortisone, prednisone (dehydrocortisone), and prednisolone (dehydrohydrocortisone)) (g).
- 2937.22.00 Halogenated derivatives of adrenal cortical hormones: General Free; Special none; Column 2 25%.
- 2937.22.00.10 Dexamethasone (INN) and its salts (g).
- 2937.22.00.90 Other (under: Halogenated derivatives of adrenal cortical hormones) (g).
- 2937.23 Estrogens and progestins (under: Steroidal hormones, their derivatives and structural analogues).
- 2937.23.10 Obtained directly or indirectly from animal or vegetable materials: General Free; Special none; Column 2 25%.
- 2937.23.10.10 Estrogens (under: Obtained directly or indirectly from animal or vegetable materials) (g).
- 2937.23.10.20 Progesterone (under: Other) (kg).
- 2937.23.10.50 Other (under: Other) (kg).
- 2937.23.25.00 Estradiol benzoate; and Estradiol cyclopentylpropionate (Estradiol cypionate) (g): General Free; Special none; Column 2 15.4¢/kg + 49%.
- 2937.23.50 Other (under: Other): General Free; Special none; Column 2 15.4¢/kg + 78.5%.
- 2937.23.50.10 Estrogens (under: Other) (g).
- 2937.23.50.20 Progesterone (under: Other) (g).
- 2937.23.50.50 Other (under: Other) (g).
- 2937.29 Other (under: Steroidal hormones, their derivatives and structural analogues).
- 2937.29.10.00 Desonide; andNandrolone phenproprionate (g): General Free; Special none; Column 2 15.4¢/kg + 49%.
- 2937.29.90 Other (under: Other): General Free; Special none; Column 2 25%.
- 2937.29.90.20 Salts and esters of hydrocortisone (g).
- 2937.29.90.30 Salts and esters of prednisone (g).
- 2937.29.90.40 Salts and esters of prednisolone (g).
- 2937.29.90.50 Anabolic agents and androgens (g).
- 2937.29.90.95 Other (under: Other) (g).
- 2937.50.00.00 Prostaglandins, thromboxanes and leukotrienes, their derivatives and structural analogues (g): General Free; Special none; Column 2 25%.
- 2937.90 Other (under: Hormones, prostaglandins, thromboxanes and leukotrienes, natural or reproduced by synthesis; derivatives and structural analogues thereof, including chain modified polypeptides, used primarily as hormones).
- 2937.90.05.00 Epinephrine (under: Catecholamine hormones, their derivatives and structural analogues) (g): General Free; Special none; Column 2 15.4¢/kg + 49%.
- 2937.90.10.00 Epinephrine hydrochloride (under: Other) (g): General Free; Special none; Column 2 15.4¢/kg + 49%.
- 2937.90.20.00 Other (under: Other) (g): General Free; Special none; Column 2 25%.
- 2937.90.40.00 l-Thyroxine (Levothyroxine), sodium (kg): General Free; Special none; Column 2 15.4¢/kg + 49%.
- 2937.90.45.00 Other (under: Amino-acid derivatives) (g): General Free; Special none; Column 2 25%.
- 2937.90.90.00 Other (under: Other) (g): General Free; Special none; Column 2 25%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.