HTS Heading 3002

Human blood; animal blood prepared for therapeutic, prophylactic or diagnostic uses; antisera, other blood fractions and immunological products, whether or not modified or obtained by means of biotechnological processes; vaccines, toxins, cultures of micro-organisms (excluding yeasts) and similar products; cell cultures, whether or not modified

All 21 HTS codes under heading 3002 (human blood), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 3002

  • 3002 Human blood; animal blood prepared for therapeutic, prophylactic or diagnostic uses; antisera, other blood fractions and immunological products, whether or not modified or obtained by means of biotechnological processes; vaccines, toxins, cultures of micro-organisms (excluding yeasts) and similar products; cell cultures, whether or not modified.
  • 3002.12.00 Antisera and other blood fractions: General Free; Special none; Column 2 Free.
  • 3002.12.00.10 Human blood plasma (under: Antisera and other blood fractions) (kg).
  • 3002.12.00.20 Normal human blood sera, whether or not freeze-dried (kg).
  • 3002.12.00.30 Human immune blood sera (under: Antisera and other blood fractions) (kg).
  • 3002.12.00.40 Fetal Bovine Serum (FBS) (under: Antisera and other blood fractions) (kg).
  • 3002.12.00.90 Other (under: Antisera and other blood fractions) (kg).
  • 3002.13.00 Immunological products, unmixed, not put up in measured doses or in forms or packings for retail sale: General Free; Special none; Column 2 Free.
  • 3002.13.00.10 Monoclonal antibodies (under: Immunological products, unmixed, not put up in measured doses or in forms or packings for retail sale) (kg).
  • 3002.13.00.90 Other (under: Immunological products, unmixed, not put up in measured doses or in forms or packings for retail sale) (kg).
  • 3002.14.00 Immunological products, mixed, not put up in measured doses or in forms or packings for retail sale: General Free; Special none; Column 2 Free.
  • 3002.14.00.10 Containing monoclonal antibodies (kg).
  • 3002.14.00.90 Other (under: Immunological products, mixed, not put up in measured doses or in forms or packings for retail sale) (kg).
  • 3002.15.00 Immunological products, put up in measured doses or in forms or packings for retail sale: General Free; Special none; Column 2 Free.
  • 3002.15.00.11 Containing monoclonal antibodies (kg).
  • 3002.15.00.91 Other (under: Immunological products, put up in measured doses or in forms or packings for retail sale) (kg).
  • 3002.41.00.00 Vaccines for human medicine (under: Vaccines, toxins, cultures of micro-organisms (excluding yeasts) and similar products) (kg): General Free; Special none; Column 2 Free.
  • 3002.42.00.00 Vaccines for veterinary medicine (kg): General Free; Special none; Column 2 Free.
  • 3002.49.00 Other (under: Vaccines, toxins, cultures of micro-organisms (excluding yeasts) and similar products): General Free; Special none; Column 2 Free.
  • 3002.49.00.10 Ricin (under: Other) (kg).
  • 3002.49.00.50 Other (under: Other) (kg).
  • 3002.51.00.00 Cell therapy products (under: Cell cultures, whether or not modified) (kg): General Free; Special none; Column 2 Free.
  • 3002.59.00.00 Other (under: Cell cultures, whether or not modified) (kg): General Free; Special none; Column 2 Free.
  • 3002.90 Other (under: Human blood; animal blood prepared for therapeutic, prophylactic or diagnostic uses; antisera, other blood fractions and immunological products, whether or not modified or obtained by means of biotechnological processes; vaccines, toxins, cultures of micro-organisms (excluding yeasts) and similar products; cell cultures, whether or not modified).
  • 3002.90.10.00 Ferments (under: Other) (kg): General Free; Special none; Column 2 25%.
  • 3002.90.52 Other (under: Other): General Free; Special none; Column 2 Free.
  • 3002.90.52.10 Whole human blood (under: Other) (kg).
  • 3002.90.52.20 Antiallergenic preparations (under: Other) (kg).
  • 3002.90.52.50 Other (under: Other) (kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.