HTS Heading 3003
Medicaments (excluding goods of heading 3002, 3005 or 3006) consisting of two or more constituents which have been mixed together for therapeutic or prophylactic uses, not put up in measured doses or in forms or packings for retail sale
All 15 HTS codes under heading 3003 (medicaments), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 3003
- 3003 Medicaments (excluding goods of heading 3002, 3005 or 3006) consisting of two or more constituents which have been mixed together for therapeutic or prophylactic uses, not put up in measured doses or in forms or packings for retail sale.
- 3003.10.00.00 Containing penicillins or derivatives thereof, with a penicillanic acid structure, or streptomycins or their derivatives (kg): General Free; Special none; Column 2 15.4¢/kg + 49%.
- 3003.20.00.00 Other, containing antibiotics (kg): General Free; Special none; Column 2 25%.
- 3003.31.00.00 Containing insulin (under: Other, containing hormones or other products of heading 2937) (kg): General Free; Special none; Column 2 25%.
- 3003.39 Other (under: Other, containing hormones or other products of heading 2937).
- 3003.39.10.00 Artificial mixtures of natural hormones (g): General Free; Special none; Column 2 25%.
- 3003.39.50.00 Other (under: Other) (kg): General Free; Special none; Column 2 30%.
- 3003.41.00.00 Containing ephedrine or its salts (kg): General Free; Special none; Column 2 Free.
- 3003.42.00.00 Containing pseudoephedrine (INN) or its salts (kg): General Free; Special none; Column 2 Free.
- 3003.43.00.00 Containing norephedrine or its salts (kg): General Free; Special none; Column 2 Free.
- 3003.49.00.00 Other (under: Other, containing alkaloids or derivatives thereof) (kg): General Free; Special none; Column 2 Free.
- 3003.60.00.00 Other, containing antimalarial active principles described in subheading note 2 to this chapter (kg): General Free; Special none; Column 2 Free.
- 3003.90.01 Other (under: Medicaments (excluding goods of heading 3002, 3005 or 3006) consisting of two or more constituents which have been mixed together for therapeutic or prophylactic uses, not put up in measured doses or in forms or packings for retail sale): General Free; Special none; Column 2 30%.
- 3003.90.01.20 Antivirals (under: Anti-infective medicaments) (kg).
- 3003.90.01.40 Antifungals (under: Anti-infective medicaments) (kg).
- 3003.90.01.60 Antiprotozoals (excluding goods described in subheading note 2 to this chapter) (kg).
- 3003.90.01.80 Other (under: Anti-infective medicaments) (kg).
- 3003.90.01.90 Other (under: Other) (kg).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.