HTS Heading 3004

Medicaments (excluding goods of heading 3002, 3005 or 3006) consisting of mixed or unmixed products for therapeutic or prophylactic uses, put up in measured doses (including those in the form of transdermal administration systems) or in forms or packings for retail sale

All 138 HTS codes under heading 3004 (medicaments), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 3004

  • 3004 Medicaments (excluding goods of heading 3002, 3005 or 3006) consisting of mixed or unmixed products for therapeutic or prophylactic uses, put up in measured doses (including those in the form of transdermal administration systems) or in forms or packings for retail sale.
  • 3004.10 Containing penicillins or derivatives thereof, with a penicillanic acid structure, or streptomycins or their derivatives.
  • 3004.10.10 Containing penicillin G salts: General Free; Special none; Column 2 15.4¢/kg + 49%.
  • 3004.10.10.10 For veterinary use (under: Containing penicillin G salts) (kg).
  • 3004.10.10.20 Singles (under: Other) (kg).
  • 3004.10.10.45 Combination antibiotics (under: Other) (kg).
  • 3004.10.50 Other (under: Containing penicillins or derivatives thereof, with a penicillanic acid structure, or streptomycins or their derivatives): General Free; Special none; Column 2 15.4¢/kg + 45%.
  • 3004.10.50.10 For veterinary use (under: Other) (kg).
  • 3004.10.50.48 Containing piperacillin and tazobactam or its salts (kg).
  • 3004.10.50.49 Other (under: Combination antibiotics) (kg).
  • 3004.10.50.55 For oral suspension (under: Containing amoxicillin or its salts) (kg).
  • 3004.10.50.65 Other (under: Containing amoxicillin or its salts) (kg).
  • 3004.10.50.70 Containing ampicillin or its salts (kg).
  • 3004.10.50.80 Other (under: Other) (kg).
  • 3004.20.00 Other, containing antibiotics: General Free; Special none; Column 2 25%.
  • 3004.20.00.10 For veterinary use (under: Other, containing antibiotics) (kg).
  • 3004.20.00.20 Erythromycin, singles or in combination with other antibiotics (kg).
  • 3004.20.00.30 Tetracycline, singles or in combination with other antibiotics (kg).
  • 3004.20.00.42 Containing amikacin or its salts (kg).
  • 3004.20.00.45 Containing azithromycin or its salts (kg).
  • 3004.20.00.55 Containing clindamycin or its salts (kg).
  • 3004.20.00.58 Containing daptomycin or its salts (kg).
  • 3004.20.00.65 Containing doxycycline or its salts (kg).
  • 3004.20.00.70 Containing cefdinir or its salts (kg).
  • 3004.20.00.71 Containing cefepime or its salts (kg).
  • 3004.20.00.72 Containing ceftazidime or its salts (kg).
  • 3004.20.00.73 Containing ceftriaxone or its salts (kg).
  • 3004.20.00.74 Containing micafungin or its salts (kg).
  • 3004.20.00.76 Containing meropenem or its salts (kg).
  • 3004.20.00.78 Containing tobramycin or its salts (kg).
  • 3004.20.00.80 Containing vancomycin or its salts (kg).
  • 3004.20.00.85 Other (under: Other) (kg).
  • 3004.31.00 Containing insulin (under: Other, containing hormones or other products of heading 2937): General Free; Special none; Column 2 25%.
  • 3004.31.00.10 Containing insulin glargine (under: Containing insulin) (kg).
  • 3004.31.00.90 Other (under: Containing insulin) (kg).
  • 3004.32.00 Containing corticosteroid hormones their derivatives or structural analogues: General Free; Special none; Column 2 25%.
  • 3004.32.00.10 Containing dexamethasone or its salts (kg).
  • 3004.32.00.20 Containing hydrocortisone or its salts (kg).
  • 3004.32.00.40 Containing methylprednisolone or its salts (kg).
  • 3004.32.00.80 Other (under: Containing corticosteroid hormones their derivatives or structural analogues) (kg).
  • 3004.39.00 Other (under: Other, containing hormones or other products of heading 2937): General Free; Special none; Column 2 25%.
  • 3004.39.00.10 For veterinary use (under: Other) (kg).
  • 3004.39.00.15 Containing desmopressin acetate (kg).
  • 3004.39.00.20 Containing epinephrine (under: Other) (kg).
  • 3004.39.00.30 Containing levothyroxine or its salts (kg).
  • 3004.39.00.40 Containing norepinephrine (under: Other) (kg).
  • 3004.39.00.45 Containing vasopressin (under: Other) (kg).
  • 3004.39.00.80 Other (under: Other) (kg).
  • 3004.41.00.00 Containing ephedrine or its salts (kg): General Free; Special none; Column 2 25%.
  • 3004.42.00.00 Containing pseudoephedrine (INN) or its salts (kg): General Free; Special none; Column 2 25%.
  • 3004.43.00.00 Containing norephedrine or its salts (kg): General Free; Special none; Column 2 25%.
  • 3004.49.00 Other (under: Other, containing alkaloids or derivatives thereof): General Free; Special none; Column 2 25%.
  • 3004.49.00.05 For veterinary use (under: Other) (kg).
  • 3004.49.00.10 Cardiovascular medicaments (under: Other) (kg).
  • 3004.49.00.20 Anticonvulsants, hypnotics, and sedatives (kg).
  • 3004.49.00.30 Antidepressants, tranquilizers and other psychotherapeutic agents (kg).
  • 3004.49.00.40 Other (under: Medicaments primarily affecting the central nervous system) (kg).
  • 3004.49.00.50 Dermatological agents and local anesthetics (kg).
  • 3004.49.00.60 Medicaments primarily affecting the eyes, ears or respiratory system (kg).
  • 3004.49.00.70 Other (under: Other) (kg).
  • 3004.50 Containing vitamins synthesized wholly or in part from aromatic or modified aromatic industrial organic compounds.
  • 3004.50.10.00 Vitamin B2 (under: Containing vitamins synthesized wholly or in part from aromatic or modified aromatic industrial organic compounds) (kg): General Free; Special none; Column 2 15.4¢/kg + 62%.
  • 3004.50.20.00 Vitamin B12 (under: Containing vitamins synthesized wholly or in part from aromatic or modified aromatic industrial organic compounds) (kg): General Free; Special none; Column 2 15.4¢/kg + 145.5%.
  • 3004.50.30.00 Vitamin E (under: Containing vitamins synthesized wholly or in part from aromatic or modified aromatic industrial organic compounds) (kg): General Free; Special none; Column 2 15.4¢/kg + 63.5%.
  • 3004.50.40.00 Other (under: Containing vitamins synthesized wholly or in part from aromatic or modified aromatic industrial organic compounds) (kg): General Free; Special none; Column 2 15.4¢/kg + 49%.
  • 3004.50.50 Other (under: Other, containing vitamins or other products of heading 2936): General Free; Special none; Column 2 25%.
  • 3004.50.50.05 For veterinary use (under: Other) (kg).
  • 3004.50.50.10 Combined with minerals or other nutrients (kg).
  • 3004.50.50.15 Vitamin B1 (thiamine) (under: Other) (kg).
  • 3004.50.50.25 Vitamin K1 (phytonadione) (under: Other) (kg).
  • 3004.50.50.28 Other (under: Other) (kg).
  • 3004.50.50.30 Combined with minerals or other nutrients (kg).
  • 3004.50.50.40 Other (under: Multiple vitamins) (kg).
  • 3004.60.00.00 Other, containing antimalarial active principles described in subheading note 2 to this chapter (kg): General Free; Special none; Column 2 30%.
  • 3004.90 Other (under: Medicaments (excluding goods of heading 3002, 3005 or 3006) consisting of mixed or unmixed products for therapeutic or prophylactic uses, put up in measured doses (including those in the form of transdermal administration systems) or in forms or packings for retail sale).
  • 3004.90.10.00 Containing antigens or hyaluronic acid or its sodium salt (kg): General Free; Special none; Column 2 Free.
  • 3004.90.92 Other (under: Other): General Free; Special none; Column 2 30%.
  • 3004.90.92.01 For veterinary use (under: Other) (kg).
  • 3004.90.92.03 Containing acyclovir or its salts (kg).
  • 3004.90.92.04 Containing oseltamivir or its salts (kg).
  • 3004.90.92.05 Containing valganciclovir, peramivir or their salts (kg).
  • 3004.90.92.06 Other (under: Antivirals) (kg).
  • 3004.90.92.07 Containing fluconazole or its salts (kg).
  • 3004.90.92.08 Other (under: Antifungals) (kg).
  • 3004.90.92.09 Containing metronidazole or its salts (kg).
  • 3004.90.92.10 Other (under: Antiprotozoals (excluding goods described in subheading note 2 to this chapter)) (kg).
  • 3004.90.92.11 Containing trimethoprim and sulfamethoxazole or their salts (kg).
  • 3004.90.92.12 Other (under: Sulfonamides) (kg).
  • 3004.90.92.13 Containing levofloxacin or its salts (kg).
  • 3004.90.92.14 Containing linezolid or its salts (kg).
  • 3004.90.92.15 Other (under: Other) (kg).
  • 3004.90.92.16 Containing hydroxyurea or cyclophosphamide or their salts (kg).
  • 3004.90.92.17 Containing tacrolimus or mycophenolate mofetil or its salts (kg).
  • 3004.90.92.18 Other (under: Antineoplastic and immunosuppressive medicaments) (kg).
  • 3004.90.92.19 Containing metoprolol or its salts (kg).
  • 3004.90.92.20 Containing amiodarone or its salts (kg).
  • 3004.90.92.21 Containing diltiazem or its salts (kg).
  • 3004.90.92.22 Containing hydralazine or its salts (kg).
  • 3004.90.92.23 Containing enoxaparin or its salts (kg).
  • 3004.90.92.24 Containing labetalol or its salts (kg).
  • 3004.90.92.25 Containing argatroban, adenosine, amlodipine, esmolol, dobutamine, phenoxybenzamine or their salts (kg).
  • 3004.90.92.26 Other (under: Cardiovascular medicaments) (kg).
  • 3004.90.92.27 Tolmetin (under: Analgesics, antipyretics and nonhormonal anti-inflammatory agents) (kg).
  • 3004.90.92.28 Tolmetin sodium dihydrate (under: Analgesics, antipyretics and nonhormonal anti-inflammatory agents) (kg).
  • 3004.90.92.29 Tolmetin sodium (anhydrous) (under: Analgesics, antipyretics and nonhormonal anti-inflammatory agents) (kg).
  • 3004.90.92.30 For oral suspension (under: Containing ibuprofen or its salts) (kg).
  • 3004.90.92.31 Other (under: Containing ibuprofen or its salts) (kg).
  • 3004.90.92.32 For oral suspension (under: Containing acetaminophen or its salts) (kg).
  • 3004.90.92.33 Other (under: Containing acetaminophen or its salts) (kg).
  • 3004.90.92.34 Containing O-Acetylsalicylic acid (Aspirin) (kg).
  • 3004.90.92.35 Containing tramadol (under: Analgesics, antipyretics and nonhormonal anti-inflammatory agents) (kg).
  • 3004.90.92.36 Other (under: Analgesics, antipyretics and nonhormonal anti-inflammatory agents) (kg).
  • 3004.90.92.37 Containing dexmedetomidine, etomidate, midazolam, propofol or their salts (kg).
  • 3004.90.92.38 Containing midazolam or its salts (kg).
  • 3004.90.92.39 Containing phenytoin or its salts (kg).
  • 3004.90.92.40 Containing propofol or its salts (kg).
  • 3004.90.92.41 Containing levetiracetam, phenytoin or their salts (kg).
  • 3004.90.92.42 Containing etomidate or its salts (kg).
  • 3004.90.92.43 Other (under: Anticonvulsants, hypnotics and sedatives) (kg).
  • 3004.90.92.44 Containing lorazepam or its salts (kg).
  • 3004.90.92.45 Containing olanzapine or its salts (kg).
  • 3004.90.92.46 Other (under: Antidepressants, tranquilizers, and other psychotherapeutic agents) (kg).
  • 3004.90.92.47 Containing rocuronium or its salts (kg).
  • 3004.90.92.48 Containing succinylcholine or its salts (kg).
  • 3004.90.92.49 Other (under: Other) (kg).
  • 3004.90.92.50 Containing lidocaine or its salts (kg).
  • 3004.90.92.51 Other (under: Dermatological agents and local anesthetics) (kg).
  • 3004.90.92.52 Laxatives (under: Medicaments primarily affecting the digestive system) (kg).
  • 3004.90.92.53 Antacids (under: Medicaments primarily affecting the digestive system) (kg).
  • 3004.90.92.54 Containing famotidine or its salts (kg).
  • 3004.90.92.55 Containing pantoprazole or its salts (kg).
  • 3004.90.92.56 Containing ondansetron or its salts (kg).
  • 3004.90.92.57 Containing glycopyrrolate or its salts (kg).
  • 3004.90.92.58 Containing loperamide or its salts (kg).
  • 3004.90.92.60 Other (under: Medicaments primarily affecting the digestive system) (kg).
  • 3004.90.92.61 Containing furosemide and its salts (kg).
  • 3004.90.92.62 Containing hydrochlorothiazide or its salts (kg).
  • 3004.90.92.63 Other (under: Diuretics) (kg).
  • 3004.90.92.64 Containing calcium gluconate (under: Other) (kg).
  • 3004.90.92.65 Containing potassium chloride (kg).
  • 3004.90.92.66 Containing sodium bicarbonate, in injection form (kg).
  • 3004.90.92.67 Other (under: Other) (kg).
  • 3004.90.92.68 Cough and cold preparations (under: Medicaments primarily affecting the eyes, ears, or respiratory system) (kg).
  • 3004.90.92.69 Containing diphenhydramine or its salts (kg).
  • 3004.90.92.70 Other (under: Antihistamines) (kg).
  • 3004.90.92.71 Containing albuterol sulfate (under: Other) (kg).
  • 3004.90.92.72 Containing timolol maleate (under: Other) (kg).
  • 3004.90.92.73 Other (under: Other) (kg).
  • 3004.90.92.74 Containing heparin sodium or its salts (kg).
  • 3004.90.92.75 Containing zoledronic acid or its salts (kg).
  • 3004.90.92.76 Other (under: Other) (kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.