HTS Heading 3214
Glaziers' putty, grafting putty, resin cements, caulking compounds and other mastics; painters' fillings; nonrefractory surfacing preparations for facades, indoor walls, floors, ceilings or the like
All 5 HTS codes under heading 3214 (glaziers' putty, grafting putty), with their duty rates from the 2026 HTS Revision 23. General duty Free to 3.7%.
Every line of heading 3214
- 3214 Glaziers' putty, grafting putty, resin cements, caulking compounds and other mastics; painters' fillings; nonrefractory surfacing preparations for facades, indoor walls, floors, ceilings or the like.
- 3214.10.00 Glazier's putty, grafting putty, resin cements, caulking compounds and other mastics; painters' fillings: General 3.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20%.
- 3214.10.00.10 Caulking compounds (under: Mastics) (kg).
- 3214.10.00.20 Other (under: Mastics) (kg).
- 3214.10.00.90 Painters' fillings (under: Glazier's putty, grafting putty, resin cements, caulking compounds and other mastics; painters' fillings) (kg).
- 3214.90 Other (under: Glaziers' putty, grafting putty, resin cements, caulking compounds and other mastics; painters' fillings; nonrefractory surfacing preparations for facades, indoor walls, floors, ceilings or the like).
- 3214.90.10.00 Based on rubber (under: Other) (kg): General Free; Special none; Column 2 20%.
- 3214.90.50.00 Other (under: Other) (kg): General 3.25%; Special Free (A+,AU,BH,CL,CO,D,E,IL, JO,KR,MA,OM,P, PA,PE,S,SG); Column 2 60%.
From MFG Calcs data: Adhesives and sealants
U.S. imports of adhesives and sealants (headings 3214, 3506) came to $1.25B in 2025, with $140M in calculated duty: an effective duty of 11.3%, every duty included.
Effective duty in Sep 2026: 10.3%, against 16.1% in Sep 2025.
Largest sources in 2025: Germany $296M at 11.4% effective duty; Canada $194M at 1.6% effective duty; Mexico $154M at 0.8% effective duty; China $95.0M at 50.4% effective duty; South Korea $58.7M at 8.3% effective duty.
These are family totals from U.S. import statistics published through USITC DataWeb, not this heading's rate alone; effective duty is calculated duty as a share of customs value, an estimate, not a ruling.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.