Tariff monitor · Other Families
Adhesives and Sealants: Statutory & Effective Tariff Rates
USITC Column 1 General rates for 8 adhesives and sealants HTS lines (parseable range 0%–6.5%). Effective rate Aug 2026: 10.25%; monthly history since 2020.
The short answer
- The observed effective calculated-duty rate on U.S. imports of adhesives and sealants was 10.25% in Aug 2026, down from 13.13% a year earlier — USITC Calculated Duties divided by covered customs value. The Column 1 General line-rate range is 0%–6.5% across 8 HTS lines in the 2026 schedule; individual lines are called “Free” only when the official General field is literally Free, which still does not determine a shipment’s final duty. Germany is the largest source, holding 23.7% of 2025 imports.
Statutory rates from the schedule
- Structural adhesives, prepared glues, caulks, and mastics — bonding and sealing where fasteners and welds do not reach. This family covers HTS headings 3214, 3506: 8 eight-digit rate lines with a parseable Column 1 General range of 0%–6.5% in the 2026 schedule. “Free” means the official General field is literally Free for that line; it does not determine final entry liability.
- Chapter 99 references on individual lines (for example, 9903.90.08) identify provisions to review; applicability and any additional duty depend on the entry facts.
Observed calculated-duty data
- Latest month on record (2026-08): 10.25% effective on $116.4M of imports, versus 13.13% in the same month a year earlier. The monthly archive holds 80 observations from 2020-01 through 2026-08.
- In 2025, U.S. imports for consumption in this family totaled $1.2B in customs value, with $140.4M in USITC reported calculated duty on $1.2B of covered customs value: an effective calculated-duty rate of 11.27%. The aggregate reflects the recorded entry mix but does not attribute the result to a specific legal provision.
- A year earlier the effective calculated-duty rate was 3.55%, so the observed rate rose 7.7 points.
- Top source countries in 2025: Germany ($296.0M at 11.39%), Canada ($194.3M at 1.56%), Mexico ($153.8M at 0.83%), China ($95.0M at 50.38%), South Korea ($58.7M at 8.33%).
- Reported freight and insurance equaled 4.27% of covered customs value in 2025 ($53.3M total), from USITC DataWeb. It is shown alongside the effective calculated-duty rate and is not part of the customs-value duty base.
- Customs unit value: 4.039 per kg in 2025, aggregate declared customs value divided by reported quantity across eligible single-unit lines (USITC DataWeb); not a transaction price.
- For scale, 2025 imports in this family equal 0.1% of the U.S. chemical products industry's $1.04T gross output (2025, BEA).
Representative rate lines
- 3214.10.00: Glazier's putty, grafting putty, resin cements, caulking compounds and other mastics; pain · MFN 3.7%
- 3214.90.10.00: Based on rubber · MFN Free
- 3214.90.50.00: Other · MFN 3.25%
- 3506.10.10.00: Animal glue, including casein glue, but not including fish glue · MFN 6.5%
- 3506.10.50.00: Other · MFN 2.1%
- 3506.91.10.00: Optically clear free-film adhesives and optically clear curable liquid adhesives of a kind · MFN Free
- 3506.91.50.00: Other · MFN 2.1%
- 3506.99.00.00: Other · MFN 2.1%
Frequently asked questions
- What is the U.S. tariff rate on adhesives and sealants? USITC calculated duties imply an effective rate of 10.25% in Aug 2026 (calculated duties ÷ covered customs value, USITC DataWeb). The parseable Column 1 General line-rate range is 0%–6.5%; individual lines are called “Free” only when the official General field is literally Free, and product, origin, preference and tariff mix can contribute to the observed-rate difference.
- What are the statutory MFN line rates for adhesives and sealants? The parseable Column 1 General line-rate range is 0%–6.5% across the family's 8 eight-digit HTS lines in the 2026 Harmonized Tariff Schedule (headings 3214, 3506). “Free” means the official General field is literally Free for a line; it does not determine final entry liability.
- Which countries supply the most adhesives and sealants to the U.S.? Top retained sources in 2025: Germany ($296.0M at 11.39%), Canada ($194.3M at 1.56%), Mexico ($153.8M at 0.83%). Germany holds 23.7% of total family import customs value. Retained sources cover 80.9%; their HHI is 1100, a lower bound whose floor falls in the diversified range without classifying the omitted tail.
- How much adhesives and sealants does the U.S. import? $1.2B of customs value in 2025, with $140.4M in USITC Calculated Duties — an effective calculated-duty rate of 11.27%.
- Is the U.S. a net importer of adhesives and sealants? Roughly balanced in 2025: $1.2B imported vs $1.3B exported.
- What is the customs unit value of adhesives and sealants? $4.04/kg in 2025, derived as customs value ÷ reported quantity from USITC DataWeb. It is an aggregate across the family's product and origin mix, not a transaction price or supplier quote.
About this data
- Reference statistics derived from USITC published data. Not a customs ruling. MFN-Free and Special-rate fields describe statutory line coverage only; final entry liability requires origin, date, eligibility, exclusions and other transaction facts. Calculated Duties are statistical estimates, not a cash-collections ledger. Confirm classification, origin, program eligibility, and final entry liability with a licensed customs broker.
Last reviewed 2026-10-08.