HTS Heading 3215
Printing ink, writing or drawing ink and other inks, whether or not concentrated or solid
All 18 HTS codes under heading 3215 (printing ink), with their duty rates from the 2026 HTS Revision 23. General duty Free to 3.1%.
Every line of heading 3215
- 3215 Printing ink, writing or drawing ink and other inks, whether or not concentrated or solid.
- 3215.11 Black (under: Printing ink).
- 3215.11.10.00 In engineered shapes, for insertion into apparatus of subheadings 8443.31, 8443.32 or 8443.39 (kg): General Free; Special none; Column 2 10%.
- 3215.11.30.00 Other (under: Solid) (kg): General 1.8%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 10%.
- 3215.11.90 Other (under: Black): General 1.8%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 10%.
- 3215.11.90.10 News (under: Other) (kg).
- 3215.11.90.20 Flexographic (under: Other) (kg).
- 3215.11.90.30 Gravure (under: Other) (kg).
- 3215.11.90.40 Letterpress (under: Other) (kg).
- 3215.11.90.50 Offset Lithographic (under: Other) (kg).
- 3215.11.90.60 Other (under: Other) (kg).
- 3215.19 Other (under: Printing ink).
- 3215.19.10.00 In engineered shapes, for insertion into apparatus of subheadings 8443.31, 8443.32 or 8443.39 (kg): General Free; Special none; Column 2 10%.
- 3215.19.30.00 Other (under: Solid) (kg): General 1.8%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 10%.
- 3215.19.90 Other (under: Other): General 1.8%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 10%.
- 3215.19.90.10 News (under: Other) (kg).
- 3215.19.90.20 Flexographic (under: Other) (kg).
- 3215.19.90.30 Gravure (under: Other) (kg).
- 3215.19.90.40 Letterpress (under: Other) (kg).
- 3215.19.90.50 Offset lithographic (under: Other) (kg).
- 3215.19.90.60 Other (under: Other) (kg).
- 3215.90 Other (under: Printing ink, writing or drawing ink and other inks, whether or not concentrated or solid).
- 3215.90.10.00 Drawing ink (under: Other) (kg): General 3.1%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 15%.
- 3215.90.50.00 Other (under: Other) (kg): General 1.8%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 10%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.