HTS Heading 3301
Essential oils (terpeneless or not), including concretes and absolutes; resinoids; extracted oleoresins; concentrates of essential oils in fats, in fixed oils, in waxes or the like, obtained by enfleurage or maceration; terpenic by products of the deterpenation of essential oils; aqueous distillates and aqueous solutions of essential oils
All 40 HTS codes under heading 3301 (essential oils (terpeneless or not)), with their duty rates from the 2026 HTS Revision 23. General duty Free to 4.2%.
Every line of heading 3301
- 3301 Essential oils (terpeneless or not), including concretes and absolutes; resinoids; extracted oleoresins; concentrates of essential oils in fats, in fixed oils, in waxes or the like, obtained by enfleurage or maceration; terpenic by products of the deterpenation of essential oils; aqueous distillates and aqueous solutions of essential oils.
- 3301.12.00.00 Of orange (under: Essential oils of citrus fruit) (kg): General 2.7%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 3301.13.00.00 Of lemon (under: Essential oils of citrus fruit) (kg): General 3.8%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P, PA,PE,S,SG); Column 2 25%.
- 3301.19 Other (under: Essential oils of citrus fruit).
- 3301.19.10.00 Of grapefruit (under: Other) (kg): General 2.7%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 3301.19.51 Other (under: Other): General Free; Special none; Column 2 25%.
- 3301.19.51.10 Bergamot (under: Other) (kg).
- 3301.19.51.20 Lime (under: Other) (kg).
- 3301.19.51.50 Other (under: Other) (kg).
- 3301.24.00.00 Of peppermint (Mentha piperita) (kg): General 4.2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 3301.25.00 Of other mints (under: Essential oils other than those of citrus fruit): General Free; Special none; Column 2 25%.
- 3301.25.00.10 Of cornmint, including "peppermint" derived from Mentha arvensis (kg).
- 3301.25.00.20 Of spearmint (under: Of other mints) (kg).
- 3301.25.00.50 Other (under: Of other mints) (kg).
- 3301.29 Other (under: Essential oils other than those of citrus fruit).
- 3301.29.10.00 Of eucalyptus (under: Other) (kg): General 1.8%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 15%.
- 3301.29.20.00 Of orris (under: Other) (kg): General 1.1%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 3301.29.51 Other (under: Other): General Free; Special none; Column 2 Free.
- 3301.29.51.03 Of anise (under: Other) (kg).
- 3301.29.51.05 Of caraway (under: Other) (kg).
- 3301.29.51.07 Of cassia (under: Other) (kg).
- 3301.29.51.09 Of cedarwood (under: Other) (kg).
- 3301.29.51.11 Of citronella (under: Other) (kg).
- 3301.29.51.13 Of clove (under: Other) (kg).
- 3301.29.51.15 Of garlic (under: Other) (kg).
- 3301.29.51.16 Of geranium (under: Other) (kg).
- 3301.29.51.17 Of jasmine (under: Other) (kg).
- 3301.29.51.18 Of lavender or lavandin (under: Other) (kg).
- 3301.29.51.19 Of lemongrass (under: Other) (kg).
- 3301.29.51.21 Of linaloe or bois de rose (under: Other) (kg).
- 3301.29.51.25 Of nutmeg (under: Other) (kg).
- 3301.29.51.28 Of onion (under: Other) (kg).
- 3301.29.51.29 Of patchouli (under: Other) (kg).
- 3301.29.51.33 Of petitgrain (under: Other) (kg).
- 3301.29.51.35 Of rose (attar of roses) (under: Other) (g).
- 3301.29.51.37 Of rosemary (under: Other) (kg).
- 3301.29.51.39 Of sandalwood (under: Other) (kg).
- 3301.29.51.41 Of sassafras including Ocotea cymbarum (kg).
- 3301.29.51.42 Of vetiver (under: Other) (kg).
- 3301.29.51.43 Of ylang ylang or cananga (under: Other) (kg).
- 3301.29.51.50 Other (under: Other) (kg).
- 3301.30.00.00 Resinoids (under: Essential oils (terpeneless or not), including concretes and absolutes; resinoids; extracted oleoresins; concentrates of essential oils in fats, in fixed oils, in waxes or the like, obtained by enfleurage or maceration; terpenic by products of the deterpenation of essential oils; aqueous distillates and aqueous solutions of essential oils) (kg): General Free; Special none; Column 2 Free.
- 3301.90 Other (under: Essential oils (terpeneless or not), including concretes and absolutes; resinoids; extracted oleoresins; concentrates of essential oils in fats, in fixed oils, in waxes or the like, obtained by enfleurage or maceration; terpenic by products of the deterpenation of essential oils; aqueous distillates and aqueous solutions of essential oils).
- 3301.90.10 Extracted oleoresins (under: Other): General 3.8%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 3301.90.10.10 Paprika (under: Extracted oleoresins) (kg).
- 3301.90.10.20 Black pepper (under: Extracted oleoresins) (kg).
- 3301.90.10.50 Other (under: Extracted oleoresins) (kg).
- 3301.90.50.00 Other (under: Other) (kg): General Free; Special none; Column 2 20%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.