HTS Heading 3901
Polymers of ethylene, in primary forms
All 12 HTS codes under heading 3901 (polymers of ethylene, in primary forms), with their duty rates from the 2026 HTS Revision 23. General duty Free to 6.5%.
Every line of heading 3901
- 3901 Polymers of ethylene, in primary forms.
- 3901.10 Polyethylene having a specific gravity of less than 0.94.
- 3901.10.10.00 Having a relative viscosity of 1.44 or more (kg): General 6.5%; Special Free (AU,BH,CL,CO,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 43%.
- 3901.10.50 Other (under: Polyethylene having a specific gravity of less than 0.94): General 6.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 43%.
- 3901.10.50.10 Linear low density polyethylene (kg).
- 3901.10.50.20 Low density polyethylene, except linear low density polyethylene (kg).
- 3901.10.50.30 Medium density polyethylene (under: Other) (kg).
- 3901.20 Polyethylene having a specific gravity of 0.94 or more.
- 3901.20.10.00 Having a relative viscosity of 1.44 or more (kg): General 6.5%; Special Free (AU,BH,CL,CO,E,IL, JO,KR,MA, OM,P, PA,PE,S,SG); Column 2 43%.
- 3901.20.50.00 Other (under: Polyethylene having a specific gravity of 0.94 or more) (kg): General 6.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 43%.
- 3901.30 Ethylene-vinyl acetate copolymers.
- 3901.30.20.00 Vinyl acetate-vinyl chloride-ethylene terpolymers, containing by weight less than 50 percent derivatives of vinyl acetate, except those polymerized from aromatic or modified aromatic monomers (kg): General Free; Special none; Column 2 43.5%.
- 3901.30.60.00 Other (under: Ethylene-vinyl acetate copolymers) (kg): General 5.3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 43.5%.
- 3901.40.00.00 Ethylene-alpha-olefin copolymers, having a specific gravity of less than 0.94 (kg): General 6.5%; Special Free (AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 43%.
- 3901.90 Other (under: Polymers of ethylene, in primary forms).
- 3901.90.10.00 Elastomeric (under: Other) (kg): General Free; Special none; Column 2 20%.
- 3901.90.55.01 Ethylene copolymers (under: Other) (kg): General 6.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 43%.
- 3901.90.90.00 Other (under: Other) (kg): General 6.5%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,K,KR,MA,OM,P,PA,PE,S,SG); Column 2 2.2¢/kg +33.5%.
From MFG Calcs data: Plastics in primary forms
U.S. imports of plastics in primary forms (headings 3901, 3902, 3903, 3904, 3906, 3907, 3908) came to $12.49B in 2025, with $674M in calculated duty: an effective duty of 5.4%, every duty included.
Effective duty in Sep 2026: 7.6%, against 7.5% in Sep 2025.
Largest sources in 2025: Canada $4.15B at 0.3% effective duty; South Korea $1.51B at 5.1% effective duty; Mexico $1.17B at 0.3% effective duty; Germany $921M at 8.4% effective duty; Japan $863M at 7.9% effective duty.
These are family totals from U.S. import statistics published through USITC DataWeb, not this heading's rate alone; effective duty is calculated duty as a share of customs value, an estimate, not a ruling.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.