HTS Heading 3914
Ion-exchangers based on polymers of headings 3901 to 3913, in primary forms
All 2 HTS codes under heading 3914 (ion-exchangers based on polymers), with their duty rates from the 2026 HTS Revision 23. General duty Free to 3.9%.
Every line of heading 3914
- 3914.00 Ion-exchangers based on polymers of headings 3901 to 3913, in primary forms.
- 3914.00.20.00 Cross-linked polyvinylbenzyltrimethylammonium chloride (Cholestyramine resin USP) (kg): General Free; Special none; Column 2 35%.
- 3914.00.60.00 Other (under: Ion-exchangers based on polymers of headings 3901 to 3913, in primary forms) (kg): General 3.9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,K,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.