HTS Heading 3915

Waste, parings and scrap, of plastics

All 5 HTS codes under heading 3915 (waste, parings and scrap, of plastics), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 3915

  • 3915 Waste, parings and scrap, of plastics.
  • 3915.10.00.00 Of polymers of ethylene (under: Waste, parings and scrap, of plastics) (kg): General Free; Special none; Column 2 10%.
  • 3915.20.00.00 Of polymers of styrene (under: Waste, parings and scrap, of plastics) (kg): General Free; Special none; Column 2 10%.
  • 3915.30.00.00 Of polymers of vinyl chloride (kg): General Free; Special none; Column 2 10%.
  • 3915.90.00 Of other plastics (under: Waste, parings and scrap, of plastics): General Free; Special none; Column 2 10%.
  • 3915.90.00.10 Of polyethylene terephthalate (PET) plastics (kg).
  • 3915.90.00.90 Other (under: Of other plastics) (kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.