HTS Heading 3917
Tubes, pipes and hoses and fittings therefor (for example, joints, elbows, flanges), of plastics
All 23 HTS codes under heading 3917 (tubes), with their duty rates from the 2026 HTS Revision 23. General duty Free to 6.5%.
Every line of heading 3917
- 3917 Tubes, pipes and hoses and fittings therefor (for example, joints, elbows, flanges), of plastics.
- 3917.10 Artificial guts (sausage casings) of hardened protein or of cellulosic plastics materials.
- 3917.10.10.00 Of cellulosic plastics materials (kg): General 6.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 60%.
- 3917.10.60.00 Of collagen (under: Other) (kg): General Free; Special none; Column 2 40%.
- 3917.10.90.00 Other (under: Other) (kg): General 4.2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 3917.21.00.00 Of polymers of ethylene (under: Tubes, pipes and hoses, rigid) (kg): General 3.1%; Special Free (A,AU,B,BH,C,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 3917.22.00.00 Of polymers of propylene (under: Tubes, pipes and hoses, rigid) (kg): General 3.1%; Special Free (A,AU,B,BH,C,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 3917.23.00.00 Of polymers of vinyl chloride (kg): General 3.1%; Special Free (A,AU,B,BH,C,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 3917.29.00 Of other plastics (under: Tubes, pipes and hoses, rigid): General 3.1%; Special Free (A,AU,B,BH,C,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 3917.29.00.50 Less than 200 mm in length (under: Of other plastics) (thousands, kg).
- 3917.29.00.90 Other (under: Of other plastics) (kg).
- 3917.31.00.00 Flexible tubes, pipes and hoses, having a minimum burst pressure of 27.6 MPa (kg): General 3.1%; Special Free (A,AU,B,BH,C,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 3917.32.00 Other, not reinforced or otherwise combined with other materials, without fittings: General 3.1%; Special Free (A*,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 3917.32.00.10 Of polyvinyl chloride (under: Other, not reinforced or otherwise combined with other materials, without fittings) (kg).
- 3917.32.00.20 Of polyethylene (under: Other, not reinforced or otherwise combined with other materials, without fittings) (kg).
- 3917.32.00.50 Other (under: Other, not reinforced or otherwise combined with other materials, without fittings) (kg).
- 3917.33.00.00 Other, not reinforced or otherwise combined with other materials, with fittings (kg): General 3.1%; Special Free (A,AU,B,BH,C,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 3917.39.00 Other (under: Other tubes, pipes and hoses): General 3.1%; Special Free (A*,AU,B,BH,C,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 3917.39.00.10 Reinforced with metal (under: Other) (kg).
- 3917.39.00.20 Of polyvinyl chloride (under: Other) (kg).
- 3917.39.00.50 Other (under: Other) (kg).
- 3917.40.00 Fittings (under: Tubes, pipes and hoses and fittings therefor (for example, joints, elbows, flanges), of plastics): General 5.3%; Special Free (A,AU,B,BH,C,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 80%.
- 3917.40.00.10 For brake hoses for the vehicles of subheadings 8701.21, 8701.22, 8701.23, 8701.24 or 8701.29 or headings 8702, 8703, 8704, 8705 or 8711 (kg).
- 3917.40.00.20 Of polyvinyl chloride (under: Plumbing fittings, not pressure rated (Drain/Waste/Vent (DWV))) (kg).
- 3917.40.00.30 Of acrylonitrile-butadiene-styrene (kg).
- 3917.40.00.50 Other (under: Plumbing fittings, not pressure rated (Drain/Waste/Vent (DWV))) (kg).
- 3917.40.00.60 Of polyvinyl chloride (under: Other plumbing fittings) (kg).
- 3917.40.00.80 Other (under: Other plumbing fittings) (kg).
- 3917.40.00.95 Other (under: Fittings) (kg).
From MFG Calcs data: Plastic semi-finished products
U.S. imports of plastic semi-finished products (headings 3916, 3917, 3920, 3921) came to $13.16B in 2025, with $1.29B in calculated duty: an effective duty of 9.8%, every duty included.
Effective duty in Sep 2026: 10.6%, against 13.0% in Sep 2025.
Largest sources in 2025: Canada $3.02B at 0.3% effective duty; Mexico $1.68B at 1.0% effective duty; China $984M at 47.4% effective duty; Germany $928M at 11.4% effective duty; South Korea $850M at 8.5% effective duty.
These are family totals from U.S. import statistics published through USITC DataWeb, not this heading's rate alone; effective duty is calculated duty as a share of customs value, an estimate, not a ruling.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.