HTS Heading 3918

Floor coverings of plastics, whether or not self-adhesive, in rolls or in the form of tiles; wall or ceiling coverings of plastics, as defined in note 9 to this chapter

All 15 HTS codes under heading 3918 (floor coverings of plastics), with their duty rates from the 2026 HTS Revision 23. General duty 4.2% to 6.5%.

Every line of heading 3918

  • 3918 Floor coverings of plastics, whether or not self-adhesive, in rolls or in the form of tiles; wall or ceiling coverings of plastics, as defined in note 9 to this chapter.
  • 3918.10 Of polymers of vinyl chloride.
  • 3918.10.10 Vinyl tile (under: Floor coverings): General 5.3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
  • 3918.10.10.20 Vinyl tile consisting of a rigid solid polymer core (m2).
  • 3918.10.10.30 Vinyl tile consisting of a rigid expanded polymer core of a kind described in statistical note 2 to this chapter (m2).
  • 3918.10.10.40 Other (under: Vinyl tile) (m2).
  • 3918.10.20.00 Other (under: Floor coverings) (m2): General 5.3%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
  • 3918.10.31 Over 70 percent by weight of plastics: General 4.2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 3918.10.31.10 Woven (under: Over 70 percent by weight of plastics) (m2).
  • 3918.10.31.50 Other (under: Over 70 percent by weight of plastics) (m2).
  • 3918.10.32 Other (under: With a backing of man-made fibers): General 6.5%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 84.5%.
  • 3918.10.32.10 Woven (under: Other) (m2).
  • 3918.10.32.50 Other (under: Other) (m2).
  • 3918.10.40 Other (under: With a backing of textile fibers): General 5.3%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
  • 3918.10.40.10 Woven (under: Other) (m2).
  • 3918.10.40.50 Other (under: Other) (m2).
  • 3918.10.50.00 Other (under: Wall or ceiling coverings) (m2): General 4.2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 3918.90 Of other plastics (under: Floor coverings of plastics, whether or not self-adhesive, in rolls or in the form of tiles; wall or ceiling coverings of plastics, as defined in note 9 to this chapter).
  • 3918.90.10.00 Floor coverings (under: Of other plastics) (m2): General 5.3%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
  • 3918.90.20.00 With a backing of man-made fibers (m2): General 6.5%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 84.5%.
  • 3918.90.30.00 Other (under: With a backing of textile fibers) (m2): General 5.3%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
  • 3918.90.50.00 Other (under: Wall or ceiling coverings) (m2): General 4.2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.