HTS Heading 3921
Other plates, sheets, film, foil and strip, of plastics
All 26 HTS codes under heading 3921 (other plates, sheets, film), with their duty rates from the 2026 HTS Revision 23. General duty 4.2% to 6.5%.
Every line of heading 3921
- 3921 Other plates, sheets, film, foil and strip, of plastics.
- 3921.11.00.00 Of polymers of styrene (under: Cellular) (kg): General 5.3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 80%.
- 3921.12 Of polymers of vinyl chloride.
- 3921.12.11.00 Over 70 percent by weight of plastics (m2, kg): General 4.2%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 3921.12.15.00 Other (229) (under: Products with textile components in which man-made fibers predominate by weight over any other single textile fiber) (m2, kg): General 6.5%; Special Free (AU,B,BH,CL,CO,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 84.5%.
- 3921.12.19 Other (under: Combined with textile materials): General 5.3%; Special Free (A*,AU,B,BH,CL,CO,D,E,IL,J,JO,KR,MA,OM,P,PE,S,SG); Column 2 40%.
- 3921.12.19.10 Products with textile components in which vegetable fibers predominate by weight over any other single textile fiber (m2, kg).
- 3921.12.19.50 Other (under: Other) (m2, kg).
- 3921.12.50.00 Other (under: Of polymers of vinyl chloride) (kg): General 6.5%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 50%.
- 3921.13 Of polyurethanes (under: Cellular).
- 3921.13.11.00 Over 70 percent by weight of plastics (m2, kg): General 4.2%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 3921.13.15.00 Other (229) (under: Products with textile components in which man-made fibers predominate by weight over any other single textile fiber) (m2, kg): General 6.5%; Special Free (AU,B,BH,CL,CO,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 84.5%.
- 3921.13.19 Other (under: Combined with textile materials): General 5.3%; Special Free (A+,AU,B,BH,CL,CO,D,E*,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 3921.13.19.10 Products with textile components in which vegetable fibers predominate by weight over any other single textile fiber (m2, kg).
- 3921.13.19.50 Other (under: Other) (m2, kg).
- 3921.13.50.00 Other (under: Of polyurethanes) (kg): General 4.2%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 3921.14.00.00 Of regenerated cellulose (under: Cellular) (kg): General 6.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 60%.
- 3921.19.00 Of other plastics (under: Cellular): General 6.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 50%.
- 3921.19.00.10 Microporous sheets of polyethylene or polypropylene film (kg).
- 3921.19.00.90 Other (under: Of other plastics) (kg).
- 3921.90 Other (under: Other plates, sheets, film, foil and strip, of plastics).
- 3921.90.11.00 Over 70 percent by weight of plastics (m2, kg): General 4.2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 3921.90.15.00 Other (229) (under: Products with textile components in which man-made fibers predominate by weight over any other single textile fiber) (m2, kg): General 6.5%; Special Free (AU,B,BH,CL,CO,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 84.5%.
- 3921.90.19 Other (under: Combined with textile materials and weighing not more than 1.492 kg/m2): General 5.3%; Special Free (A+,AU,B,BH,CL,CO,D,E*,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 3921.90.19.10 Products with textile components in which vegetable fibers predominate by weight over any other single textile fiber (m2, kg).
- 3921.90.19.50 Other (under: Other) (m2, kg).
- 3921.90.21.00 Products with textile components in which cotton predominates by weight over any other single textile fiber (m2, kg): General 6.5%; Special Free (A+,AU,BH,CL,CO,D,E*,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 3921.90.25 Products with textile components in which man-made fibers predominate by weight over any other single textile fiber: General 6.5%; Special Free (AU,BH,CL,E*,IL,J*,JO,KR,MA,OM,P,PE,S,SG); Column 2 83.5%.
- 3921.90.25.10 Over 70 percent by weight of plastics (m2, kg).
- 3921.90.25.50 Other (229) (under: Products with textile components in which man-made fibers predominate by weight over any other single textile fiber) (m2, kg).
- 3921.90.29.00 Other (under: Combined with textile materials and weighing more than 1.492 kg/m2) (kg): General 4.4%; Special Free (A+,AU,BH,CL,CO,D,E*,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 3921.90.40 Flexible (under: Other): General 4.2%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 3921.90.40.10 Reinforced with paper (under: Flexible) (kg).
- 3921.90.40.90 Other (under: Flexible) (kg).
- 3921.90.50 Other (under: Other): General 4.8%; Special Free (A*,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 42.5%.
- 3921.90.50.10 High pressure paper reinforced decorative laminates (m2, kg).
- 3921.90.50.50 Other (under: Other) (m2, kg).
From MFG Calcs data: Plastic semi-finished products
U.S. imports of plastic semi-finished products (headings 3916, 3917, 3920, 3921) came to $13.16B in 2025, with $1.29B in calculated duty: an effective duty of 9.8%, every duty included.
Effective duty in Sep 2026: 10.6%, against 13.0% in Sep 2025.
Largest sources in 2025: Canada $3.02B at 0.3% effective duty; Mexico $1.68B at 1.0% effective duty; China $984M at 47.4% effective duty; Germany $928M at 11.4% effective duty; South Korea $850M at 8.5% effective duty.
These are family totals from U.S. import statistics published through USITC DataWeb, not this heading's rate alone; effective duty is calculated duty as a share of customs value, an estimate, not a ruling.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.