HTS Heading 3920
Other plates, sheets, film, foil and strip, of plastics, noncellular and not reinforced, laminated, supported or similarly combined with other materials
All 33 HTS codes under heading 3920 (other plates, sheets, film), with their duty rates from the 2026 HTS Revision 23. General duty Free to 6.5%.
Every line of heading 3920
- 3920 Other plates, sheets, film, foil and strip, of plastics, noncellular and not reinforced, laminated, supported or similarly combined with other materials.
- 3920.10.00.00 Of polymers of ethylene (under: Other plates, sheets, film, foil and strip, of plastics, noncellular and not reinforced, laminated, supported or similarly combined with other materials) (kg): General 4.2%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 3920.20.00 Of polymers of propylene (under: Other plates, sheets, film, foil and strip, of plastics, noncellular and not reinforced, laminated, supported or similarly combined with other materials): General 4.2%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 3920.20.00.15 Strip put up in packaging for use as decorative or gift-wrapping ribbon (kg).
- 3920.20.00.20 Gift wrap (under: Of polymers of propylene) (kg).
- 3920.20.00.55 Other (under: Of polymers of propylene) (kg).
- 3920.30.00.00 Of polymers of styrene (under: Other plates, sheets, film, foil and strip, of plastics, noncellular and not reinforced, laminated, supported or similarly combined with other materials) (kg): General 5.8%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 3920.43 Containing by weight not less than 6 percent of plasticizers.
- 3920.43.10.00 Made in imitation of patent leather (m2, kg): General 3.1%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 3920.43.50.00 Other (under: Containing by weight not less than 6 percent of plasticizers) (kg): General 4.2%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 3920.49.00.00 Other (under: Of polymers of vinyl chloride) (kg): General 5.8%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 3920.51 Of poly(methyl methacrylate) (under: Of acrylic polymers).
- 3920.51.10.00 Flexible (under: Of poly(methyl methacrylate)) (kg): General 6%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 3920.51.50 Other (under: Of poly(methyl methacrylate)): General 6.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 48.2%.
- 3920.51.50.50 Sheets, not flexible, containing flame retardant (kg).
- 3920.51.50.90 Other (under: Other) (kg).
- 3920.59 Other (under: Of acrylic polymers).
- 3920.59.10.00 Flexible (under: Other) (kg): General 6%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 3920.59.40.00 Transparent sheeting containing 30 percent or more by weight of lead (kg): General Free; Special none; Column 2 51.7%.
- 3920.59.80.00 Other (under: Other) (kg): General 6.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 51.7%.
- 3920.61.00.00 Of polycarbonates (under: Of polycarbonates, alkyd resins, polyallyl esters or other polyesters) (kg): General 5.8%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 3920.62.00 Of poly(ethylene terephthalate): General 4.2%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 3920.62.00.20 Gift wrap (under: Metallized PET film) (kg).
- 3920.62.00.50 Other (under: Metallized PET film) (kg).
- 3920.62.00.90 Other (under: Of poly(ethylene terephthalate)) (kg).
- 3920.63 Of unsaturated polyesters (under: Of polycarbonates, alkyd resins, polyallyl esters or other polyesters).
- 3920.63.10.00 Flexible (under: Of unsaturated polyesters) (kg): General 4.2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 3920.63.20.00 Other (under: Of unsaturated polyesters) (kg): General 5.8%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 3920.69.00.00 Of other polyesters (under: Of polycarbonates, alkyd resins, polyallyl esters or other polyesters) (kg): General 4.2%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 3920.71.00.00 Of regenerated cellulose (under: Of cellulose or its chemical derivatives) (kg): General 6.2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 3920.73.00.00 Of cellulose acetate (under: Of cellulose or its chemical derivatives) (kg): General 2.9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30.5%.
- 3920.79 Of other cellulose derivatives.
- 3920.79.05.00 Of vulcanized fiber (under: Of other cellulose derivatives) (kg): General 3.1%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
- 3920.79.10.00 Film, strip and sheets, not over 0.076 mm in thickness (kg): General 6.2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
- 3920.79.50.00 Other (under: Other) (kg): General 3.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 28.5%.
- 3920.91.00.00 Of poly(vinyl butyral) (under: Of other plastics) (kg): General 4.2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 3920.92.00.00 Of polyamides (under: Of other plastics) (kg): General 4.2%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 3920.93.00.00 Of amino-resins (under: Of other plastics) (kg): General 5.8%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 3920.94.00.00 Of phenolic resins (under: Of other plastics) (kg): General 5.8%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
- 3920.99 Of other plastics (under: Of other plastics).
- 3920.99.10.00 Over 0.152 mm in thickness, and not in rolls (kg): General 6%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 3920.99.20.00 Other (under: Film, strip and sheets, all the foregoing which are flexible) (kg): General 4.2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 3920.99.50.00 Other (under: Of other plastics) (kg): General 5.8%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
From MFG Calcs data: Plastic semi-finished products
U.S. imports of plastic semi-finished products (headings 3916, 3917, 3920, 3921) came to $13.16B in 2025, with $1.29B in calculated duty: an effective duty of 9.8%, every duty included.
Effective duty in Sep 2026: 10.6%, against 13.0% in Sep 2025.
Largest sources in 2025: Canada $3.02B at 0.3% effective duty; Mexico $1.68B at 1.0% effective duty; China $984M at 47.4% effective duty; Germany $928M at 11.4% effective duty; South Korea $850M at 8.5% effective duty.
These are family totals from U.S. import statistics published through USITC DataWeb, not this heading's rate alone; effective duty is calculated duty as a share of customs value, an estimate, not a ruling.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.