HTS Heading 3925

Builders' ware of plastics, not elsewhere specified or included

All 7 HTS codes under heading 3925 (builders' ware of plastics), with their duty rates from the 2026 HTS Revision 23. General duty 3.3% to 6.3%.

Every line of heading 3925

  • 3925 Builders' ware of plastics, not elsewhere specified or included.
  • 3925.10.00.00 Reservoirs, tanks, vats and similar containers, of a capacity exceeding 300 liters (No. and kg): General 6.3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 56%.
  • 3925.20.00 Doors, windows and their frames and thresholds for doors: General 5.3%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 80%.
  • 3925.20.00.10 Doors and door frames (under: Doors, windows and their frames and thresholds for doors) (No., kg).
  • 3925.20.00.20 Windows and window frames (under: Doors, windows and their frames and thresholds for doors) (No., kg).
  • 3925.20.00.91 Other (under: Doors, windows and their frames and thresholds for doors) (No. and kg).
  • 3925.30 Shutters, blinds (including venetian blinds) and similar articles and parts thereof.
  • 3925.30.10.00 Blinds (including venetian blinds) (No.): General 3.3%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 3925.30.50.00 Other (under: Shutters, blinds (including venetian blinds) and similar articles and parts thereof) (No. and kg): General 5.3%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 80%.
  • 3925.90.00.00 Other (under: Builders' ware of plastics, not elsewhere specified or included) (No. and kg): General 5.3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 80%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.