HTS Heading 3926

Other articles of plastics and articles of other materials of headings 3901 to 3914

All 54 HTS codes under heading 3926 (other articles of plastics), with their duty rates from the 2026 HTS Revision 23. General duty Free to 6.5%.

Every line of heading 3926

  • 3926 Other articles of plastics and articles of other materials of headings 3901 to 3914.
  • 3926.10.00.00 Office or school supplies (under: Other articles of plastics and articles of other materials of headings 3901 to 3914) (kg): General 5.3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 80%.
  • 3926.20 Articles of apparel and clothing accessories (including gloves, mittens and mitts).
  • 3926.20.10 Seamless (under: Gloves, mittens and mitts): General Free; Special none; Column 2 25%.
  • 3926.20.10.10 Surgical and medical (under: Seamless) (doz. prs.).
  • 3926.20.10.20 Disposable (under: Other) (doz. prs.).
  • 3926.20.10.50 Other (under: Other) (doz. prs.).
  • 3926.20.20.00 Baseball and softball gloves and mitts (No.): General Free; Special none; Column 2 30%.
  • 3926.20.30.00 Other (under: Specially designed for use in sports) (No.): General 3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
  • 3926.20.40 Other (under: Other): General 6.5%; Special Free (A+,AU,BH,CL,CO,D,E,IL, JO,KR,MA,OM,P, PA,PE,S,SG); Column 2 25%.
  • 3926.20.40.10 Disposable (under: Other) (doz. prs.).
  • 3926.20.40.50 Other (under: Other) (doz. prs.).
  • 3926.20.60.00 Plastic rainwear, including jackets, coats, ponchos, parkas and slickers, featuring an outer shell of polyvinyl chloride plastic with or without attached hoods, valued not over $10 per unit (doz.): General Free; Special none; Column 2 25%.
  • 3926.20.90 Other (under: Other): General 5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 3926.20.90.10 Aprons (under: Other) (doz.).
  • 3926.20.90.50 Other (under: Other) (doz.).
  • 3926.30 Fittings for furniture, coachwork or the like.
  • 3926.30.10.00 Handles and knobs (under: Fittings for furniture, coachwork or the like) (kg): General 6.5%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG) 3.25% (JP); Column 2 57.5%.
  • 3926.30.50.00 Other (under: Fittings for furniture, coachwork or the like) (kg): General 5.3%; Special Free (A+,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG) 2.65% (JP); Column 2 80%.
  • 3926.40.00 Statuettes and other ornamental articles: General 5.3%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 80%.
  • 3926.40.00.10 Bows and similar products for decorative purposes including gift-packaging and the like (No.).
  • 3926.40.00.90 Other (under: Statuettes and other ornamental articles) (No.).
  • 3926.90 Other (under: Other articles of plastics and articles of other materials of headings 3901 to 3914).
  • 3926.90.10.00 Buckets and pails (under: Other) (No.): General 3.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 80%.
  • 3926.90.16.00 Pacifiers (under: Other) (gross): General 3.1%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 3926.90.21.00 Ice bags; douche bags, enema bags, hot water bottles, and fittings therefor; invalid and similar nursing cushions; dress shields; pessaries; prophylactics; bulbs for syringes; syringes (other than hypodermic syringes) and fittings therefor, not in part of glass or metal (No.): General 4.2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 3926.90.25.00 Handles and knobs, not elsewhere specified or included, of plastics (kg): General 6.5%; Special Free (A,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 57.5%.
  • 3926.90.30.00 Parts for yachts or pleasure boats of heading 8903; parts of canoes, racing shells, pneumatic craft and pleasure boats which are not of a type designed to be principally used with motors or sails (kg): General 4.2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
  • 3926.90.33.00 Handbags (under: Beads, bugles and spangles, not strung (except temporarily) and not set; articles thereof, not elsewhere specified or included) (No.): General 6.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 60%.
  • 3926.90.35.00 Other (under: Beads, bugles and spangles, not strung (except temporarily) and not set; articles thereof, not elsewhere specified or included) (kg): General 6.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 60%.
  • 3926.90.40.00 Imitation gemstones (under: Other) (kg): General 2.8%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 20%.
  • 3926.90.45 Gaskets, washers and other seals: General 3.5%; Special Free (A,AU,B,BH,C,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 3926.90.45.10 O-Rings (under: Gaskets, washers and other seals) (No.).
  • 3926.90.45.90 Other (under: Gaskets, washers and other seals) (No.).
  • 3926.90.48.00 Photo albums (under: Other) (No.): General 3.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 80%.
  • 3926.90.50.00 Frames or mounts for photographic slides (kg): General 3.8%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
  • 3926.90.55.00 V-belts (under: Containing textile fibers) (kg): General 5.1%; Special Free (A+,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
  • 3926.90.56.00 With textile components in which vegetable fibers predominate by weight over any other textile fiber (kg): General 5.1%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
  • 3926.90.57.00 With textile components in which man-made fibers predominate by weight over any other textile fiber (kg): General 6.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 74%.
  • 3926.90.59.00 Other (under: Other) (kg): General 2.4%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 3926.90.60 Other (under: Belting and belts, for machinery): General 4.2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 3926.90.60.10 Synchronous belts (under: Other) (No.).
  • 3926.90.60.90 Other (under: Other) (kg).
  • 3926.90.65 Spring type (under: Clothespins): General 4.2%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 8.4%.
  • 3926.90.65.10 Valued not over 80 cents per gross (gross).
  • 3926.90.65.20 Valued over 80 cents but not over $1.35 per gross (gross).
  • 3926.90.65.30 Valued over $1.35 but not over $1.70 per gross (gross).
  • 3926.90.65.50 Valued over $1.70 per gross (under: Spring type) (gross).
  • 3926.90.70.00 Other (under: Clothespins) (gross): General 5.3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 80%.
  • 3926.90.75.00 Pneumatic mattresses and other inflatable articles, not elsewhere specified or included (No.): General 4.2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 3926.90.77.00 Waterbed mattresses and liners, and parts of the foregoing (No.): General 2.4%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 3926.90.83.00 Empty cartridges and cassettes for typewriter and machine ribbons (No.): General 5.3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 80%.
  • 3926.90.85.00 Fasteners, in clips suitable for use in a mechanical attaching device (kg): General 6.5%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 60%.
  • 3926.90.87.00 Flexible plastic document binders with tabs, rolled or flat (No.): General 5.3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 80%.
  • 3926.90.94.00 Cards, not punched, suitable for use as, or in making, jacquard cards; Jacquard cards and jacquard heads for power-driven weaving machines, and parts thereof; and Transparent sheeting of plastics containing 30 percent or more by weight of lead (No.): General Free; Special none; Column 2 80%.
  • 3926.90.96.00 Casing for bicycle derailleur cables; and casing for cable or inner wire for caliper and cantilever brakes, whether or not cut to length (kg): General Free; Special none; Column 2 25%.
  • 3926.90.99 Other (under: Other): General 5.3%; Special Free (A,AU,B,BH,C,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 80%.
  • 3926.90.99.05 Elastic bands made wholly of plastics (kg).
  • 3926.90.99.15 Separatory funnels (under: Laboratory ware) (No.).
  • 3926.90.99.20 Other (under: Laboratory ware) (No.).
  • 3926.90.99.25 Reflective triangular warning signs for road use (No.).
  • 3926.90.99.30 Ladders (under: Other) (No.).
  • 3926.90.99.40 Covers, rings and frames for manholes; catch basins; drainage gates and frames thereof; cleanout covers and frames thereof; valve, service and meter boxes (No.).
  • 3926.90.99.50 Face masks and shields, medical positioning or transport pads, medical waste containers or disinfectant wipes dispensers (No. and kg).
  • 3926.90.99.87 Rigid tubes or pipes suitable for use as electrical conduit (kg).
  • 3926.90.99.89 Other (under: Other) (No. and kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.