HTS Heading 4010

Conveyor or transmission belts or belting, of vulcanized rubber

All 35 HTS codes under heading 4010 (conveyor or transmission belts), with their duty rates from the 2026 HTS Revision 23. General duty 1.9% to 8%.

Every line of heading 4010

  • 4010 Conveyor or transmission belts or belting, of vulcanized rubber.
  • 4010.11.00.00 Reinforced only with metal (under: Conveyor belts and belting) (kg): General 3.3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 4010.12 Reinforced only with textile materials.
  • 4010.12.10.00 With textile components in which vegetable fibers predominate by weight over any other single textile fiber (kg): General 4.1%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
  • 4010.12.50.00 Of a width exceeding 20 cm (under: With textile components in which man-made fibers predominate by weight over any other single textile fiber) (kg): General 8%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 74%.
  • 4010.12.55.00 Other (under: With textile components in which man-made fibers predominate by weight over any other single textile fiber) (kg): General 6.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 74%.
  • 4010.12.90.00 Other (under: Reinforced only with textile materials) (kg): General 1.9%; Special Free (A+,AU,BH,CL,CO,D, E,IL, JO,KR,MA,OM,P, PA,PE,S,SG); Column 2 25%.
  • 4010.19 Other (under: Conveyor belts and belting).
  • 4010.19.10.00 With textile components in which vegetable fibers predominate by weight over any other single textile fiber (kg): General 4.1%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
  • 4010.19.50.00 Of a width exceeding 20 cm (under: With textile components in which man-made fibers predominate by weight over any other single textile fiber) (kg): General 8%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 74%.
  • 4010.19.55.00 Other (under: With textile components in which man-made fibers predominate by weight over any other single textile fiber) (kg): General 6.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 74%.
  • 4010.19.80.00 Other (under: Combined with textile materials) (kg): General 1.9%; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 25%.
  • 4010.19.91.00 Other (under: Other) (kg): General 3.3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 4010.31 Endless transmission belts of trapezoidal cross section (V-belts),V-ribbed, of an outside circumference exceeding 60 cm but not exceeding 180 cm.
  • 4010.31.30.00 Combined with textile materials (kg): General 3.4%; Special Free (A+,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
  • 4010.31.60.00 Other (under: Endless transmission belts of trapezoidal cross section (V-belts),V-ribbed, of an outside circumference exceeding 60 cm but not exceeding 180 cm) (kg): General 2.8%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 4010.32 Endless transmission belts of trapezoidal cross section (V-belts), other than V-ribbed, of an outside circumference exceeding 60 cm but not exceeding 180 cm.
  • 4010.32.30.00 Combined with textile materials (kg): General 3.4%; Special Free (A+,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
  • 4010.32.60.00 Other (under: Endless transmission belts of trapezoidal cross section (V-belts), other than V-ribbed, of an outside circumference exceeding 60 cm but not exceeding 180 cm) (kg): General 2.8%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 4010.33 Endless transmission belts of trapezoidal cross section (V-belts), V-ribbed, of an outside circumference exceeding 180 cm but not exceeding 240 cm.
  • 4010.33.30.00 Combined with textile materials (kg): General 3.4%; Special Free (A+,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
  • 4010.33.60.00 Other (under: Endless transmission belts of trapezoidal cross section (V-belts), V-ribbed, of an outside circumference exceeding 180 cm but not exceeding 240 cm) (kg): General 2.8%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 4010.34 Endless transmission belts of trapezoidal cross section (V-belts), other thanV-ribbed, of an outside circumference exceeding 180 cm but not exceeding 240 cm.
  • 4010.34.30.00 Combined with textile materials (kg): General 3.4%; Special Free (A+,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
  • 4010.34.60.00 Other (under: Endless transmission belts of trapezoidal cross section (V-belts), other thanV-ribbed, of an outside circumference exceeding 180 cm but not exceeding 240 cm) (kg): General 2.8%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 4010.35 Endless synchronous belts of an outside circumference exceeding 60 cm but not exceeding 150 cm.
  • 4010.35.30.00 With textile components in which vegetable fibers predominate by weight over any other single textile fiber (kg): General 4.1%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
  • 4010.35.41.00 Of a width exceeding 20 cm (under: With textile components in which man-made fibers predominate by weight over any other single textile fiber) (kg): General 8%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 74%.
  • 4010.35.45.00 Other (under: With textile components in which man-made fibers predominate by weight over any other single textile fiber) (kg): General 6.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 74%.
  • 4010.35.50.00 Other (under: Combined with textile materials) (kg): General 1.9%; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P, PA,PE,S,SG); Column 2 25%.
  • 4010.35.90.00 Other (under: Endless synchronous belts of an outside circumference exceeding 60 cm but not exceeding 150 cm) (kg): General 3.3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 4010.36 Endless synchronous belts of an outside circumference exceeding 150 cm but not exceeding 198 cm.
  • 4010.36.30.00 With textile components in which vegetable fibers predominate by weight over any other single textile fiber (kg): General 4.1%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
  • 4010.36.41.00 Of a width exceeding 20 cm (under: With textile components in which man-made fibers predominate by weight over any other single textile fiber) (kg): General 8%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 74%.
  • 4010.36.45.00 Other (under: With textile components in which man-made fibers predominate by weight over any other single textile fiber) (kg): General 6.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 74%.
  • 4010.36.50.00 Other (under: Combined with textile materials) (kg): General 1.9%; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P, PA,PE,S,SG); Column 2 25%.
  • 4010.36.90.00 Other (under: Endless synchronous belts of an outside circumference exceeding 150 cm but not exceeding 198 cm) (kg): General 3.3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 4010.39 Other (under: Transmission belts or belting).
  • 4010.39.10.00 Combined with textile materials (kg): General 3.4%; Special Free (A+,AU,B,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
  • 4010.39.20.00 Other (under: Of trapezoidal cross section (V-belts and belting)) (kg): General 2.8%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 4010.39.30.00 With textile components in which vegetable fibers predominate by weight over any other single textile fiber (kg): General 4.1%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 30%.
  • 4010.39.41.00 Of a width exceeding 20 cm (under: With textile components in which man-made fibers predominate by weight over any other single textile fiber) (kg): General 8%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 74%.
  • 4010.39.45.00 Other (under: With textile components in which man-made fibers predominate by weight over any other single textile fiber) (kg): General 6.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 74%.
  • 4010.39.50.00 Other (under: Combined with textile materials) (kg): General 1.9%; Special Free (A+,AU,BH,CL,CO,D,E, IL,JO,KR, MA,OM, P,PA,PE,S,SG); Column 2 25%.
  • 4010.39.90.00 Other (under: Other) (kg): General 3.3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.

From MFG Calcs data: Rubber materials and products

U.S. imports of rubber materials and products (headings 4002, 4009, 4010, 4016) came to $9.22B in 2025, with $1.03B in calculated duty: an effective duty of 11.2%, every duty included.

Effective duty in Sep 2026: 10.0%, against 15.2% in Sep 2025.

Largest sources in 2025: Mexico $2.36B at 1.8% effective duty; China $950M at 45.4% effective duty; Japan $798M at 9.4% effective duty; Germany $663M at 9.7% effective duty; Canada $621M at 1.9% effective duty.

These are family totals from U.S. import statistics published through USITC DataWeb, not this heading's rate alone; effective duty is calculated duty as a share of customs value, an estimate, not a ruling.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.