HTS Heading 4011
New pneumatic tires, of rubber
All 34 HTS codes under heading 4011 (new pneumatic tires, of rubber), with their duty rates from the 2026 HTS Revision 23. General duty Free to 4%.
Every line of heading 4011
- 4011 New pneumatic tires, of rubber.
- 4011.10 Of a kind used on motor cars (including station wagons and racing cars).
- 4011.10.10 Radial (under: Of a kind used on motor cars (including station wagons and racing cars)): General 4%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 10%.
- 4011.10.10.10 Having a rim diameter of 33.02 cm (13 inches) or less (No.).
- 4011.10.10.20 Having a rim diameter greater than 33.02 cm (13 inches) but not more than 35.56 cm (14 inches) (No.).
- 4011.10.10.30 Having a rim diameter greater than 35.56 cm (14 inches) but not more than 38.10 cm (15 inches) (No.).
- 4011.10.10.40 Having a rim diameter greater than 38.10 cm (15 inches) but not more than 40.64 cm (16 inches) (No.).
- 4011.10.10.50 Having a rim diameter greater than 40.64 cm (16 inches) but not more than 43.18 cm (17 inches) (No.).
- 4011.10.10.60 Having a rim diameter greater than 43.18 cm (17 inches) but not more than 45.72 cm (18 inches) (No.).
- 4011.10.10.70 Having a rim diameter greater than 45.72 cm (18 inches) (No.).
- 4011.10.50.00 Other (under: Of a kind used on motor cars (including station wagons and racing cars)) (No.): General 3.4%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 10%.
- 4011.20 Of a kind used on buses or trucks.
- 4011.20.10 Radial (under: Of a kind used on buses or trucks): General 4%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 10%.
- 4011.20.10.05 Light truck (under: On-the-highway) (No.).
- 4011.20.10.15 Other (under: On-the-highway) (No.).
- 4011.20.10.25 For use on a rim measuring 40.6 cm or more in diameter (No.).
- 4011.20.10.35 Other (under: Off-the-highway) (No.).
- 4011.20.50 Other (under: Of a kind used on buses or trucks): General 3.4%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 10%.
- 4011.20.50.10 Light truck (under: On-the-highway) (No.).
- 4011.20.50.20 Other (under: On-the-highway) (No.).
- 4011.20.50.30 For use on a rim measuring 40.6 cm or more in diameter (No.).
- 4011.20.50.50 Other (under: Off-the-highway) (No.).
- 4011.30.00 Of a kind used on aircraft (under: New pneumatic tires, of rubber): General Free; Special none; Column 2 30%.
- 4011.30.00.10 For use in civil aircraft (under: Of a kind used on aircraft) (No.).
- 4011.30.00.50 Other (under: Of a kind used on aircraft) (No.).
- 4011.40.00.00 Of a kind used on motorcycles (No.): General Free; Special none; Column 2 10%.
- 4011.50.00.00 Of a kind used on bicycles (under: New pneumatic tires, of rubber) (No.): General Free; Special none; Column 2 10%.
- 4011.70.00 Of a kind used on agricultural or forestry vehicles and machines: General Free; Special none; Column 2 Free.
- 4011.70.00.10 Having a "herring-bone" or similar tread (No.).
- 4011.70.00.50 Other (under: Of a kind used on agricultural or forestry vehicles and machines) (No.).
- 4011.80 Of a kind used on construction, mining or industrial handling vehicles and machines.
- 4011.80.10 Having a "herring-bone" or similar tread: General Free; Special none; Column 2 10%.
- 4011.80.10.10 Having a rim size not exceeding 61 cm (No.).
- 4011.80.10.20 Having a rim size exceeding 61 cm (No.).
- 4011.80.20 Radial (under: Other): General 4%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 10%.
- 4011.80.20.10 Having a rim size not exceeding 61 cm (No.).
- 4011.80.20.20 Having a rim size exceeding 61 cm (No.).
- 4011.80.80 Other (under: Other): General 3.4%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,JP,KR,MA,OM,P,PA,PE,S,SG); Column 2 10%.
- 4011.80.80.10 Having a rim size not exceeding 61 cm (No.).
- 4011.80.80.20 Having a rim size exceeding 61 cm (No.).
- 4011.90 Other (under: New pneumatic tires, of rubber).
- 4011.90.10 Having a "herring-bone" or similar tread: General Free; Special none; Column 2 10%.
- 4011.90.10.10 Of a kind used on golf carts, all-terrain vehicles, and for turf, lawn and garden, and trailer applications (No.).
- 4011.90.10.50 Other (under: Having a "herring-bone" or similar tread) (No.).
- 4011.90.20 Radial (under: Other): General 4%; Special Free (A*,AU,BH,CL,CO,D,E, IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 10%.
- 4011.90.20.10 Of a kind used on golf carts, all-terrain vehicles, and for turf, lawn and garden, and trailer applications (No.).
- 4011.90.20.50 Other (under: Radial) (No.).
- 4011.90.80 Other (under: Other): General 3.4%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 10%.
- 4011.90.80.10 Of a kind used on golf carts, all-terrain vehicles, and for turf, lawn and garden, and trailer applications (No.).
- 4011.90.80.50 Other (under: Other) (No.).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.