HTS Heading 4012

Retreaded or used pneumatic tires of rubber; solid or cushion tires, tire treads and tire flaps, of rubber

All 24 HTS codes under heading 4012 (retreaded), with their duty rates from the 2026 HTS Revision 23. General duty Free to 4.2%.

Every line of heading 4012

  • 4012 Retreaded or used pneumatic tires of rubber; solid or cushion tires, tire treads and tire flaps, of rubber.
  • 4012.11 Of a kind used on motor cars (including station wagons and racing cars).
  • 4012.11.40.00 Radial (under: Of a kind used on motor cars (including station wagons and racing cars)) (No.): General 4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 10%.
  • 4012.11.80.00 Other (under: Of a kind used on motor cars (including station wagons and racing cars)) (No.): General 3.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 10%.
  • 4012.12 Of a kind used on buses or trucks.
  • 4012.12.40 Radial (under: Of a kind used on buses or trucks): General 4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 10%.
  • 4012.12.40.15 Light truck (under: On-the-highway truck and bus tires) (No.).
  • 4012.12.40.25 Other (under: On-the-highway truck and bus tires) (No.).
  • 4012.12.40.35 Other (under: Radial) (No.).
  • 4012.12.80 Other (under: Of a kind used on buses or trucks): General 3.4%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 10%.
  • 4012.12.80.19 Light truck (under: On-the-highway truck and bus tires) (No.).
  • 4012.12.80.29 Other (under: On-the-highway truck and bus tires) (No.).
  • 4012.12.80.50 Other (under: Other) (No.).
  • 4012.13.00 Of a kind used on aircraft (under: Retreaded tires): General Free; Special none; Column 2 30%.
  • 4012.13.00.10 For use in civil aircraft (under: Of a kind used on aircraft) (No.).
  • 4012.13.00.50 Other (under: Of a kind used on aircraft) (No.).
  • 4012.19 Other (under: Retreaded tires).
  • 4012.19.20.00 Designed for tractors provided for in subheadings 8701.91.10, 8701.92.10, 8701.93.10, 8701.94.10 or 8701.95.10 or for agricultural or horticultural machinery or implements provided for in chapter 84 or in subheading 8716.80.10 (No.): General Free; Special none; Column 2 Free.
  • 4012.19.40.00 Radial (under: Other) (No.): General 4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 10%.
  • 4012.19.80.00 Other (under: Other) (No.): General 3.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 10%.
  • 4012.20 Used pneumatic tires (under: Retreaded or used pneumatic tires of rubber; solid or cushion tires, tire treads and tire flaps, of rubber).
  • 4012.20.10 Aircraft (under: Used pneumatic tires): General Free; Special none; Column 2 30%.
  • 4012.20.10.10 For use in civil aircraft (under: Aircraft) (No.).
  • 4012.20.10.50 Other (under: Aircraft) (No.).
  • 4012.20.15.00 Of a kind used on vehicles, including tractors, for the on-highway transport of passengers or goods (No.): General Free; Special none; Column 2 Free.
  • 4012.20.45.00 Other (under: Designed for tractors provided for in subheadings 8701.91.10, 8701.92.10, 8701.93.10, 8701.94.10 or 8701.95.10 or for agricultural or horticultural machinery or implements provided for in chapter 84 or in subheading 8716.80.10) (No.): General Free; Special none; Column 2 Free.
  • 4012.20.60.00 Of a kind used on vehicles, including tractors, for the on-highway transport of passengers or goods, or on vehicles of heading 8705 (No.): General Free; Special none; Column 2 10%.
  • 4012.20.80.00 Other (under: Other) (No.): General Free; Special none; Column 2 10%.
  • 4012.90 Other (under: Retreaded or used pneumatic tires of rubber; solid or cushion tires, tire treads and tire flaps, of rubber).
  • 4012.90.10.00 Solid or cushion tires (under: Other) (No.): General Free; Special none; Column 2 25%.
  • 4012.90.30.00 Bicycle rim strips (under: Of natural rubber) (kg, No.): General Free; Special none; Column 2 35%.
  • 4012.90.45.00 Other (under: Of natural rubber) (kg, No.): General 4.2%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 35%.
  • 4012.90.70.00 Bicycle rim strips (under: Other) (kg, No.): General Free; Special none; Column 2 80%.
  • 4012.90.90.00 Other (under: Other) (kg, No.): General 2.7%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 80%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.