HTS Heading 4101

Raw hides and skins of bovine (including buffalo) or equine animals (fresh, or salted, dried, limed, pickled or otherwise preserved, but not tanned, parchment-dressed or further prepared), whether or not dehaired or split

All 25 HTS codes under heading 4101 (raw hides and skins of bovine), with their duty rates from the 2026 HTS Revision 23. General duty Free to 5%.

Every line of heading 4101

  • 4101 Raw hides and skins of bovine (including buffalo) or equine animals (fresh, or salted, dried, limed, pickled or otherwise preserved, but not tanned, parchment-dressed or further prepared), whether or not dehaired or split.
  • 4101.20 Whole hides and skins, unsplit, of a weight per skin not exceeding 8 kg when simply dried, 10 kg when dry-salted, or 16 kg when fresh, wet-salted or otherwise preserved.
  • 4101.20.10 Not pretanned (under: Whole hides and skins, unsplit, of a weight per skin not exceeding 8 kg when simply dried, 10 kg when dry-salted, or 16 kg when fresh, wet-salted or otherwise preserved): General Free; Special none; Column 2 10%.
  • 4101.20.10.10 Of bovine animals (under: Not pretanned) (pcs, kg).
  • 4101.20.10.20 Of equine animals (under: Not pretanned) (pcs, kg).
  • 4101.20.20.00 Upper and lining (under: Of a unit surface area not exceeding 28 square feet (2.6 m2)) (pcs): General Free; Special none; Column 2 15%.
  • 4101.20.30.00 Other (under: Of a unit surface area not exceeding 28 square feet (2.6 m2)) (pcs): General 2.4%; Special Free (A+,AU,BH,CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 15%.
  • 4101.20.35.00 Of buffalo (under: Other) (pcs): General 2.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 4101.20.40.00 Vegetable pretanned (under: Other) (pcs): General 5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 4101.20.50.00 Other (under: Other) (pcs): General 3.3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 4101.20.70.00 Other (under: Other) (pcs, kg): General 3.3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 4101.50 Whole hides and skins, of a weight exceeding 16 kg.
  • 4101.50.10 Not pretanned (under: Whole hides and skins, of a weight exceeding 16 kg): General Free; Special none; Column 2 10%.
  • 4101.50.10.10 Cattle (under: Of bovine animals) (pcs, kg).
  • 4101.50.10.20 Other (under: Of bovine animals) (pcs, kg).
  • 4101.50.10.91 Of equine animals (under: Not pretanned) (pcs, kg).
  • 4101.50.20.00 Upper and lining (under: Of a unit surface area not exceeding 28 square feet (2.6 m2)) (pcs): General Free; Special none; Column 2 15%.
  • 4101.50.30.00 Other (under: Of a unit surface area not exceeding 28 square feet (2.6 m2)) (pcs): General 2.4%; Special Free (A+,AU,BH,CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 15%.
  • 4101.50.35.00 Of buffalo (under: Other) (pcs): General 2.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 4101.50.40.00 Vegetable pretanned (under: Other) (pcs): General 5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 4101.50.50.00 Other (under: Other) (pcs): General 3.3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 4101.50.70.00 Other (under: Other) (pcs): General 3.3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 4101.90 Other, including butts, bends and bellies.
  • 4101.90.10 Not pretanned (under: Other, including butts, bends and bellies): General Free; Special none; Column 2 10%.
  • 4101.90.10.10 Butts and bends (under: Fresh or wet-salted) (pcs, kg).
  • 4101.90.10.20 Other (under: Fresh or wet-salted) (pcs, kg).
  • 4101.90.10.30 Other (under: Of bovine animals) (pcs, kg).
  • 4101.90.10.40 Of equine animals (under: Not pretanned) (pcs, kg).
  • 4101.90.35.00 Of buffalo (under: Of bovine animals (including buffalo)) (pcs): General 2.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 4101.90.40.00 Vegetable pretanned (under: Other) (pcs): General 5%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 4101.90.50.00 Other (under: Other) (pcs): General 3.3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
  • 4101.90.70.00 Other (under: Other) (pcs): General 3.3%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.