HTS Heading 4102
Raw skins of sheep or lambs (fresh, or salted, dried, limed, pickled or otherwise preserved, but not tanned, parchment- dressed or further prepared), whether or not with wool on or split, other than those excluded by note 1(c) to this chapter
All 9 HTS codes under heading 4102 (raw skins of sheep or lambs), with their duty rates from the 2026 HTS Revision 23. General duty Free to 2%.
Every line of heading 4102
- 4102 Raw skins of sheep or lambs (fresh, or salted, dried, limed, pickled or otherwise preserved, but not tanned, parchment- dressed or further prepared), whether or not with wool on or split, other than those excluded by note 1(c) to this chapter.
- 4102.10 With wool on (under: Raw skins of sheep or lambs (fresh, or salted, dried, limed, pickled or otherwise preserved, but not tanned, parchment- dressed or further prepared), whether or not with wool on or split, other than those excluded by note 1(c) to this chapter).
- 4102.10.10.00 Not pretanned (under: With wool on) (pcs, kg): General Free; Special none; Column 2 Free.
- 4102.10.20.00 Vegetable pretanned (under: Other) (pcs, kg): General Free; Special none; Column 2 10%.
- 4102.10.30.00 Other (under: Other) (pcs, kg): General 2%; Special Free (A+,AU,BH,CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 25%.
- 4102.21.00 Pickled (under: Without wool on): General Free; Special none; Column 2 Free.
- 4102.21.00.65 Not split (under: Pickled) (pcs, kg).
- 4102.21.00.95 Other (under: Pickled) (pcs, kg).
- 4102.29 Other (under: Without wool on).
- 4102.29.10 Not pretanned (under: Other): General Free; Special none; Column 2 Free.
- 4102.29.10.10 Hair sheep and cabretta skins (pcs, kg).
- 4102.29.10.90 Other (under: Not pretanned) (pcs, kg).
- 4102.29.20.00 Vegetable pretanned (under: Other) (pcs, kg): General Free; Special none; Column 2 10%.
- 4102.29.30.00 Other (under: Other) (pcs, kg): General 2%; Special Free (A+,AU,BH,CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 25%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.