HTS Heading 4103
Other raw hides and skins (fresh, or salted, dried, limed, pickled or otherwise preserved, but not tanned, parchment-dressed or further prepared), whether or not dehaired or split, other than those excluded by note 1(b) or 1(c) to this chapter
All 11 HTS codes under heading 4103 (other raw hides and skins), with their duty rates from the 2026 HTS Revision 23. General duty Free to 5%.
Every line of heading 4103
- 4103 Other raw hides and skins (fresh, or salted, dried, limed, pickled or otherwise preserved, but not tanned, parchment-dressed or further prepared), whether or not dehaired or split, other than those excluded by note 1(b) or 1(c) to this chapter.
- 4103.20 Of reptiles (under: Other raw hides and skins (fresh, or salted, dried, limed, pickled or otherwise preserved, but not tanned, parchment-dressed or further prepared), whether or not dehaired or split, other than those excluded by note 1(b) or 1(c) to this chapter).
- 4103.20.10.00 Not pretanned (under: Of reptiles) (pcs, kg): General Free; Special none; Column 2 Free.
- 4103.20.20.00 Vegetable pretanned (under: Other) (pcs): General 5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 4103.20.30.00 Other (under: Other) (pcs): General Free; Special none; Column 2 25%.
- 4103.30 Of swine (under: Other raw hides and skins (fresh, or salted, dried, limed, pickled or otherwise preserved, but not tanned, parchment-dressed or further prepared), whether or not dehaired or split, other than those excluded by note 1(b) or 1(c) to this chapter).
- 4103.30.10.00 Not pretanned (under: Of swine) (pcs, kg): General Free; Special none; Column 2 Free.
- 4103.30.20.00 Other (under: Of swine) (pcs): General 4.2%; Special Free (A+,AU,BH,CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 25%.
- 4103.90 Other (under: Other raw hides and skins (fresh, or salted, dried, limed, pickled or otherwise preserved, but not tanned, parchment-dressed or further prepared), whether or not dehaired or split, other than those excluded by note 1(b) or 1(c) to this chapter).
- 4103.90.11 Not pretanned (under: Other): General Free; Special none; Column 2 Free.
- 4103.90.11.30 Deer (under: Not pretanned) (pcs, kg).
- 4103.90.11.40 Of goats or kids (under: Not pretanned) (pcs, kg).
- 4103.90.11.90 Other (under: Not pretanned) (kg).
- 4103.90.12.00 Vegetable pretanned (under: Of goats or kids) (pcs, kg): General Free; Special none; Column 2 10%.
- 4103.90.13.00 Other (under: Of goats or kids) (pcs, kg): General 3.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 25%.
- 4103.90.20.00 Other (under: Other) (kg): General 3.3%; Special Free (A+,AU,BH,CL,CO,D,E,IL, JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 25%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.