HTS Heading 4301
Raw furskins (including heads, tails, paws and other pieces or cuttings, suitable for furriers' use), other than raw hides and skins of heading 4101, 4102 or 4103
All 18 HTS codes under heading 4301 (raw furskins), with their duty rates from the 2026 HTS Revision 23. General duty Free to 5.1%.
Every line of heading 4301
- 4301 Raw furskins (including heads, tails, paws and other pieces or cuttings, suitable for furriers' use), other than raw hides and skins of heading 4101, 4102 or 4103.
- 4301.10.00 Of mink, whole, with or without head, tail or paws: General Free; Special none; Column 2 Free.
- 4301.10.00.10 Wild (under: Of mink, whole, with or without head, tail or paws) (No.).
- 4301.10.00.20 Other (under: Of mink, whole, with or without head, tail or paws) (No.).
- 4301.30.00.00 Of lamb, the following: Astrakhan, Broadtail, Caracul, Persian and similar lamb, Indian, Chinese, Mongolian or Tibetan lamb, whole, with or without head, tail or paws (No.): General Free; Special none; Column 2 Free.
- 4301.60 Of fox, whole, with or without head, tail or paws.
- 4301.60.30.00 Of silver, black or platinum fox (including those of any fox which is a mutation, or type developed, from silver, black or platinum foxes) (No.): General 5.1%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 50%.
- 4301.60.60.00 Other (under: Of fox, whole, with or without head, tail or paws) (No.): General Free; Special none; Column 2 Free.
- 4301.80.02 Other furskins, whole, with or without head, tail or paws: General Free; Special none; Column 2 Free.
- 4301.80.02.01 Of hare (under: Other furskins, whole, with or without head, tail or paws) (No.).
- 4301.80.02.02 Of rabbit (under: Other furskins, whole, with or without head, tail or paws) (No.).
- 4301.80.02.03 Of beaver (under: Other furskins, whole, with or without head, tail or paws) (No.).
- 4301.80.02.04 Of muskrat (under: Other furskins, whole, with or without head, tail or paws) (No.).
- 4301.80.02.10 Of nutria (under: Other furskins, whole, with or without head, tail or paws) (No.).
- 4301.80.02.20 Of lynx (under: Other furskins, whole, with or without head, tail or paws) (No.).
- 4301.80.02.40 Of marten (under: Other furskins, whole, with or without head, tail or paws) (No.).
- 4301.80.02.60 Of sable (under: Other furskins, whole, with or without head, tail or paws) (No.).
- 4301.80.02.70 Of fisher (under: Other furskins, whole, with or without head, tail or paws) (No.).
- 4301.80.02.75 Of racoon (under: Other furskins, whole, with or without head, tail or paws) (No.).
- 4301.80.02.80 Of seal (under: Other furskins, whole, with or without head, tail or paws) (No.).
- 4301.80.02.90 Other (under: Other furskins, whole, with or without head, tail or paws) (No.).
- 4301.90.00.00 Heads, tails, paws and other pieces or cuttings, suitable for furriers' use (kg): General Free; Special none; Column 2 Free.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.