HTS Heading 4401
Fuel wood, in logs, in billets, in twigs, in faggots or in similar forms; wood in chips or particles; sawdust and wood waste and scrap, whether or not agglomerated in logs, briquettes, pellets or similar forms
All 13 HTS codes under heading 4401 (fuel wood, in logs, in billets, in twigs), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 4401
- 4401 Fuel wood, in logs, in billets, in twigs, in faggots or in similar forms; wood in chips or particles; sawdust and wood waste and scrap, whether or not agglomerated in logs, briquettes, pellets or similar forms.
- 4401.11.00.00 Coniferous (under: Fuel wood, in logs, in billets, in twigs, in faggots or in similar forms) (kg): General Free; Special none; Column 2 20%.
- 4401.12.00.00 Nonconiferous (under: Fuel wood, in logs, in billets, in twigs, in faggots or in similar forms) (kg): General Free; Special none; Column 2 20%.
- 4401.21.00.00 Coniferous (under: Wood in chips or particles) (t dwb): General Free; Special none; Column 2 Free.
- 4401.22.00.00 Nonconiferous (under: Wood in chips or particles) (t dwb): General Free; Special none; Column 2 Free.
- 4401.31.00.00 Wood pellets (under: Sawdust and wood waste and scrap, agglomerated in logs, briquettes, pellets or similar forms) (kg): General Free; Special none; Column 2 Free.
- 4401.32.00.00 Wood briquettes (under: Sawdust and wood waste and scrap, agglomerated in logs, briquettes, pellets or similar forms) (kg): General Free; Special none; Column 2 Free.
- 4401.39 Other (under: Sawdust and wood waste and scrap, agglomerated in logs, briquettes, pellets or similar forms).
- 4401.39.20.00 Artificial fire logs composed of wax and sawdust, with or without added materials (kg): General Free; Special none; Column 2 20%.
- 4401.39.42 Other (under: Other): General Free; Special none; Column 2 Free.
- 4401.39.42.10 Sawdust (under: Other) (kg).
- 4401.39.42.20 Shavings (under: Other) (kg).
- 4401.39.42.90 Other (under: Other) (kg).
- 4401.41.00.00 Sawdust (under: Sawdust and wood waste and scrap, not agglomerated) (kg): General Free; Special none; Column 2 Free.
- 4401.49.00 Other (under: Sawdust and wood waste and scrap, not agglomerated): General Free; Special none; Column 2 Free.
- 4401.49.00.20 Shavings (under: Other) (kg).
- 4401.49.00.90 Other (under: Other) (kg).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.