HTS Chapter 44
Wood and articles of wood; wood charcoal
The 21 headings and 556 HTS codes of chapter 44 (wood and articles of wood), with their duty rates from the 2026 HTS Revision 23.
The 21 headings of chapter 44
- 4401: Fuel wood, in logs, in billets, in twigs, in faggots or in similar forms; wood in chips or particles; sawdust and wood waste and scrap, whether or not agglomerated in logs, briquettes, pellets or similar forms (13 codes, General duty Free)
- 4402: Wood charcoal (including shell or nut charcoal), whether or not agglomerated (3 codes, General duty Free)
- 4403: Wood in the rough, whether or not stripped of bark or sap- wood, or roughly squared (85 codes, General duty Free)
- 4404: Hoopwood; split poles; piles, pickets and stakes of wood, pointed but not sawn lengthwise; wooden sticks, roughly trimmed but not turned, bent or otherwise worked, suitable for the manufacture of walking-sticks, umbrellas, tool handles or the like; chipwood and the like (6 codes, General duty Free)
- 4405: Wood wool (excelsior); wood flour (1 code, General duty 3.2%)
- 4406: Railway or tramway sleepers (cross-ties) of wood (4 codes, General duty Free)
- 4407: Wood sawn or chipped lengthwise, sliced or peeled, whether or not planed, sanded or end-jointed, of a thickness exceeding 6 mm (74 codes, General duty Free)
- 4408: Sheets for veneering (including those obtained by slicing laminated wood), for plywood or for similar laminated wood and other wood, sawn lengthwise, sliced or peeled, whether or not planed, sanded, spliced or end-jointed, of a thickness not exceeding 6 mm (27 codes, General duty Free)
- 4409: Wood (including strips and friezes for parquet flooring, not assembled) continuously shaped (tongued, grooved, rebated, chamfered, V-jointed, beaded, molded, rounded or the like) along any of its edges, ends or faces, whether or not planed, sanded or end-jointed (47 codes, General duty Free to 4.9%)
- 4410: Particle board, oriented strand board (OSB) and similar board (for example, waferboard) of wood or other ligneous materials, whether or not agglomerated with resins or other organic binding substances (11 codes, General duty Free)
- 4411: Fiberboard of wood or other ligneous materials, whether or not bonded with resins or other organic substances (36 codes, General duty Free to 6%, some per unit)
- 4412: Plywood, veneered panels and similar laminated wood (123 codes, General duty Free to 8%)
- 4413: Densified wood, in blocks, plates, strips or profile shapes (1 code, General duty 3.7%)
- 4414: Wooden frames for paintings, photographs, mirrors or similar objects (2 codes, General duty 3.9%)
- 4415: Packing cases, boxes, crates, drums and similar packings, of wood; cable-drums, of wood; pallets, box-pallets and other load boards, of wood; pallet collars of wood (5 codes, General duty Free to 10.7%)
- 4416: Casks, barrels, vats, tubs and other coopers' products and parts thereof, of wood, including staves (10 codes, General duty Free to 3.2%)
- 4417: Tools, tool bodies, tool handles, broom or brush bodies and handles, of wood; boot or shoe lasts and trees, of wood (5 codes, General duty Free to 5.1%)
- 4418: Builders' joinery and carpentry of wood, including cellular wood panels and assembled flooring panels; shingles and shakes (45 codes, General duty Free to 8%)
- 4419: Tableware and kitchenware, of wood (8 codes, General duty 3.2% to 5.3%)
- 4420: Wood marquetry and inlaid wood; caskets and cases for jewelry or cutlery and similar articles, of wood; statuettes and other ornaments, of wood; wooden articles of furniture not falling within chapter 94 (8 codes, General duty Free to 4.3%)
- 4421: Other articles of wood (42 codes, General duty Free to 10.7%, some per unit)
Where it sits in the schedule
Chapter 44 is in Section IX of the Harmonized System, wood, cork and basketware (chapters 44 to 46). Rates are those printed in the 2026 HTS Revision 23; Chapter 99 duties (Section 232, Section 301, IEEPA) are charged on top and are not included.
Last reviewed 2026-11-12.