HTS Heading 4402
Wood charcoal (including shell or nut charcoal), whether or not agglomerated
All 3 HTS codes under heading 4402 (wood charcoal (including shell or nut charcoal)), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 4402
- 4402 Wood charcoal (including shell or nut charcoal), whether or not agglomerated.
- 4402.10.00.00 Of bamboo (under: Wood charcoal (including shell or nut charcoal), whether or not agglomerated) (t): General Free; Special none; Column 2 Free.
- 4402.20.00.00 Of shell or nut (under: Wood charcoal (including shell or nut charcoal), whether or not agglomerated) (t): General Free; Special none; Column 2 Free.
- 4402.90.01.00 Other (under: Wood charcoal (including shell or nut charcoal), whether or not agglomerated) (t): General Free; Special none; Column 2 Free.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.