HTS Heading 4412
Plywood, veneered panels and similar laminated wood
All 123 HTS codes under heading 4412 (plywood), with their duty rates from the 2026 HTS Revision 23. General duty Free to 8%.
Every line of heading 4412
- 4412 Plywood, veneered panels and similar laminated wood.
- 4412.10 Of bamboo (under: Plywood, veneered panels and similar laminated wood).
- 4412.10.05.00 Plywood (under: Of bamboo) (m3): General 8%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 4412.10.90.00 Other (under: Of bamboo) (m3): General Free; Special none; Column 2 40%.
- 4412.31 With at least one outer ply of tropical wood.
- 4412.31.06 With a face ply of birch (Betula spp.): General Free; Special none; Column 2 50%.
- 4412.31.06.20 Panels not exceeding in any dimension 3.6 mm in thickness, 1.2 m in width and 2.2 m in length (m3).
- 4412.31.06.40 Not surface covered (under: Other) (m3).
- 4412.31.06.60 Other (under: Other) (m3).
- 4412.31.26 With a face ply of Spanish cedar (Cedrela spp.) or walnut (Juglans spp): General 8%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 4412.31.26.10 With a face ply of Spanish cedar (Cedrela spp.) (m3).
- 4412.31.26.20 With a face ply of walnut (Juglans spp.) (m3).
- 4412.31.42.00 With a face ply of mahogany (Swietenia spp. or Khaya spp.) (m3): General 8%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 4412.31.45.00 Panels not exceeding 3.6 mm in thickness and exceeding 1.2 m in width and 2.2 m in length (m3): General 8%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 4412.31.48 Other (under: With at least one outer ply of the following tropical woods: Dark Red Meranti, Light Red Meranti, White Lauan, Sipo, Limba, Okoumé, Obeche, Acajou d'Afrique, Sapelli, Virola, Mahogany, Palissandre de Para, Palissandre de Rio or Palissandre de Rose): General 8%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 4412.31.48.50 Panels not exceeding 3.6 mm in thickness and not exceeding 1.2 m in width and 2.2 m in length (m3).
- 4412.31.48.60 Dark Red Meranti, Light Red Meranti or White Lauan (Luan) (Shorea spp.) (m3).
- 4412.31.48.63 Limba (Terminalia spp.), also known as Terminalia and Nargusta (m3).
- 4412.31.48.66 Virola (Virola spp.) (under: Not surface covered) (m3).
- 4412.31.48.69 Other (under: Not surface covered) (m3).
- 4412.31.48.75 Wood flooring (under: Other) (m3).
- 4412.31.48.80 Other (under: Other) (m3).
- 4412.31.52 Other (under: Other): General 8%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 4412.31.52.25 Wood flooring (under: Other) (m3).
- 4412.31.52.35 With a face ply of sen (Kalopanax spp.) (m3).
- 4412.31.52.55 Panels not exceeding in any dimension 3.6 mm in thickness, 1.2 m in width and 2.2 m in length (m3).
- 4412.31.52.60 Albizia (Albizia spp.), also known as Falcata, Batai and Suar wood (m3).
- 4412.31.52.62 Bintangor (Calophyllum spp.) (under: Not surface covered) (m3).
- 4412.31.52.64 Mersawa (Anisoptera spp.) (under: Not surface covered) (m3).
- 4412.31.52.66 Parica (Schizolobium spp.), also known as Pinho Cuiabano, Firetree and Guapuruvu (m3).
- 4412.31.52.68 Pencil cedar, Nyatoh (Palaquium spp.) (m3).
- 4412.31.52.70 Other (under: Not surface covered) (m3).
- 4412.31.52.75 Other (under: Other) (m3).
- 4412.31.61.00 With at least one outer ply of the following tropical woods: Dark Red Meranti, Light Red Meranti, White Lauan, Sipo, Limba, Okoumé, Obeche, Acajou d'Afrique, Sapelli, Virola, Mahogany, Palissandre de Para, Palissandre de Rio or Palissandre de Rose (m3): General 8%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 4412.31.92.00 Other (under: Other) (m3): General 8%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 4412.33 Other, with at least one outer ply of nonconiferous wood of the species alder (Alnus spp.), ash (Fraxinus spp.), beech (Fagus spp.), birch (Betula spp.), cherry (Prunus spp.), chestnut (Castanea spp.), elm (Ulmus spp.), eucalyptus (Eucalyptus spp.), hickory (Carya spp.), horse chestnut (Aesculus spp.), lime (Tilia spp.), maple (Acer spp.), oak (Quercus spp.), plane tree (Platanus spp.), poplar and aspen (Populus spp.), robinia (Robinia spp.), tulipwood (Liriodendron spp.) or walnut (Juglans spp.).
- 4412.33.06 With a face ply of birch (Betula spp.): General Free; Special none; Column 2 50%.
- 4412.33.06.20 Panels not exceeding in any dimension 3.6 mm in thickness, 1.2 m in width and 2.2 m in length (m3).
- 4412.33.06.40 Not surface covered (under: Other) (m3).
- 4412.33.06.65 Wood flooring (under: Other) (m3).
- 4412.33.06.70 Other (under: Other) (m3).
- 4412.33.26 With a face ply of walnut (Juglans spp.): General 5.1%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 40%.
- 4412.33.26.25 Wood flooring (under: With a face ply of walnut (Juglans spp.)) (m3).
- 4412.33.26.30 Other (under: With a face ply of walnut (Juglans spp.)) (m3).
- 4412.33.32 Other (under: Not surface covered, or surface covered with a clear or transparent material which does not obscure the grain, texture or markings of the face ply): General 8%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 4412.33.32.25 Wood flooring (under: Other) (m3).
- 4412.33.32.35 With a face ply of sen (Kalopanax spp.) (m3).
- 4412.33.32.55 With a face ply of mahogany (Swietenia spp. or Khaya spp.) (m3).
- 4412.33.32.65 Panels not exceeding in any dimension 3.6 mm in thickness, 1.2 m in width and 2.2 m in length (m3).
- 4412.33.32.75 Not surface covered (under: Other) (m3).
- 4412.33.32.85 Other (under: Other) (m3).
- 4412.33.57.00 Other (under: Other, with at least one outer ply of nonconiferous wood of the species alder (Alnus spp.), ash (Fraxinus spp.), beech (Fagus spp.), birch (Betula spp.), cherry (Prunus spp.), chestnut (Castanea spp.), elm (Ulmus spp.), eucalyptus (Eucalyptus spp.), hickory (Carya spp.), horse chestnut (Aesculus spp.), lime (Tilia spp.), maple (Acer spp.), oak (Quercus spp.), plane tree (Platanus spp.), poplar and aspen (Populus spp.), robinia (Robinia spp.), tulipwood (Liriodendron spp.) or walnut (Juglans spp.)) (m3): General 8%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 40%.
- 4412.34 Other, with at least one outer ply of nonconiferous wood not specified under subheading 4412.33.
- 4412.34.26.00 With a face ply of Spanish cedar (Cedrela spp.) (m3): General 5.1%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 4412.34.32 Other (under: Not surface covered, or surface covered with a clear or transparent material which does not obscure the grain, texture or markings of the face ply): General 8%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 4412.34.32.25 Wood flooring (under: Other) (m3).
- 4412.34.32.35 With a face ply of sen (Kalopanax spp.) (m3).
- 4412.34.32.55 With a face ply of mahogany (Swietenia spp. or Khaya spp.) (m3).
- 4412.34.32.65 Panels not exceeding in any dimension 3.6 mm in thickness, 1.2 m in width and 2.2 m in length (m3).
- 4412.34.32.75 Not surface covered (under: Other) (m3).
- 4412.34.32.85 Other (under: Other) (m3).
- 4412.34.57.00 Other (under: Other, with at least one outer ply of nonconiferous wood not specified under subheading 4412.33) (m3): General 8%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA, OM,P,PA,PE,S,SG); Column 2 40%.
- 4412.39 Other, with both outer plies of coniferous wood.
- 4412.39.10.00 With a face ply of Parana pine (Araucaria angustifolia) (m3): General Free; Special none; Column 2 40%.
- 4412.39.30.00 With a face ply of European red pine (Pinus silvestris) (m3): General 3.4%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 4412.39.40 Other (under: Not surface covered, or surface covered with a clear or transparent material which does not obscure the grain, texture or markings of the face ply): General 8%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 4412.39.40.11 Rough, or touch sanded for sizing purposes, but not further processed (m3).
- 4412.39.40.12 Fully sanded on at least one face, but not further processed (m3).
- 4412.39.40.19 Other (under: With at least one outer ply of Douglas fir (Pseudotsuga menziesii)) (m3).
- 4412.39.40.31 Rough, or touch sanded for sizing purposes, but not further processed (m3).
- 4412.39.40.32 Fully sanded on at least one face, but not further processed (m3).
- 4412.39.40.39 Other (under: With at least one outer ply of long leaf pine (Pinus palustris), short leaf pine (Pinus echinata), southern yellow pine (loblolly pine)(Pinus taeda), slash pine (Pinus elliotti), pitch pine (Pinus rigida) or Virginia pine (Pinus virginiana)) (m3).
- 4412.39.40.51 Rough, or touch sanded for sizing purposes, but not further processed (m3).
- 4412.39.40.52 Fully sanded on at least one face, but not further processed (m3).
- 4412.39.40.59 Other (under: With at least one outer ply of Agathis spp.) (m3).
- 4412.39.40.61 Rough, or touch sanded for sizing purposes, but not further processed (m3).
- 4412.39.40.62 Fully sanded on at least one face, but not further processed (m3).
- 4412.39.40.69 Other (under: Other) (m3).
- 4412.39.50 Other (under: Other, with both outer plies of coniferous wood): General 5.1%; Special Free (A+,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 4412.39.50.10 With at least one outer ply of Douglas fir (Pseudotsuga menziesii) (m3).
- 4412.39.50.30 With at least one outer ply of long leaf pine (Pinus palustris), short leaf pine (Pinus echinata), southern yellow pine (loblolly pine) (Pinus taeda), slash pine (Pinus elliotti), pitch pine (Pinus rigida) or Virginia pine (Pinus virginiana) (m3).
- 4412.39.50.50 Other (under: Other) (m3).
- 4412.41.00.00 With at least one outer ply of tropical wood (m3): General Free; Special none; Column 2 40%.
- 4412.42.00.00 Other, with at least one outer ply of nonconiferous wood (m3): General Free; Special none; Column 2 40%.
- 4412.49.00.00 Other, with both outer plies of coniferous wood (m3): General Free; Special none; Column 2 40%.
- 4412.51 With at least one outer ply of tropical wood.
- 4412.51.10 With a face ply of birch (Betula spp.): General Free; Special none; Column 2 50%.
- 4412.51.10.30 Not surface covered (under: With a face ply of birch (Betula spp.)) (m3).
- 4412.51.10.50 Other (under: With a face ply of birch (Betula spp.)) (m3).
- 4412.51.31 Other (under: Not surface covered, or surface covered with a clear or transparent material which does not obscure the grain, texture or markings of the face ply): General 8%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 4412.51.31.05 Wood flooring (under: Other) (m2, m3).
- 4412.51.31.11 With a face ply of Spanish cedar (Cedrela spp.) (m2, m3).
- 4412.51.31.21 With a face ply of walnut (Juglans spp.) (m2, m3).
- 4412.51.31.41 With a face ply of mahogany (Swietenia spp. or Khaya spp.) (m2, m3).
- 4412.51.31.61 Not surface covered (under: Other) (m2, m3).
- 4412.51.31.75 Other (under: Other) (m2, m3).
- 4412.51.41.00 Other (under: Plywood) (m3): General 8%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 4412.51.51.00 Other (under: With at least one outer ply of tropical wood) (m3): General Free; Special none; Column 2 40%.
- 4412.52 Other, with at least one outer ply of nonconiferous wood.
- 4412.52.10 With a face ply of birch (Betula spp.): General Free; Special none; Column 2 50%.
- 4412.52.10.30 Not surface covered (under: With a face ply of birch (Betula spp.)) (m3).
- 4412.52.10.50 Other (under: With a face ply of birch (Betula spp.)) (m3).
- 4412.52.31 Other (under: Not surface covered, or surface covered with a clear or transparent material which does not obscure the grain, texture or markings of the face ply): General 8%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 4412.52.31.05 Wood flooring (under: Other) (m2, m3).
- 4412.52.31.21 With a face ply of walnut (Juglans spp.) (m2, m3).
- 4412.52.31.61 Not surface covered (under: Other) (m2, m3).
- 4412.52.31.75 Other (under: Other) (m2, m3).
- 4412.52.41.00 Other (under: Plywood) (m3): General 8%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 4412.52.51.00 Other (under: Other, with at least one outer ply of nonconiferous wood) (m3): General Free; Special none; Column 2 40%.
- 4412.59 Other, with both outer plies of coniferous wood.
- 4412.59.60.00 With a face ply of Parana pine (Araucaria angustifolia) (m3): General Free; Special none; Column 2 40%.
- 4412.59.70.00 With a face ply of European red pine (Pinus silvestris) (m3): General 3.4%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 4412.59.80.00 Other (under: Not surface covered, or surface covered with a clear or transparent material which does not obscure the grain, texture or markings of the face ply) (m3): General 8%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 4412.59.90.00 Other (under: Plywood) (m3): General 5.1%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 4412.59.95.00 Other (under: Other, with both outer plies of coniferous wood) (m3): General Free; Special none; Column 2 40%.
- 4412.91 With at least one outer ply of tropical wood.
- 4412.91.06.00 Containing at least one layer of particle board (m3): General Free; Special none; Column 2 40%.
- 4412.91.10 With a face ply of birch (Betula spp.): General Free; Special none; Column 2 50%.
- 4412.91.10.20 Panels not exceeding in any dimension 3.6 mm in thickness, 1.2 m in width and 2.2 m in length (m3).
- 4412.91.10.30 Not surface covered (under: Other) (m3).
- 4412.91.10.40 Other (under: Other) (m3).
- 4412.91.31 Other (under: Not surface covered, or surface covered with a clear or transparent material which does not obscure the grain, texture or markings of the face ply): General 8%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 4412.91.31.10 With a face ply of Spanish cedar (Cedrela spp.) (m3).
- 4412.91.31.20 With a face ply of walnut (Juglans spp.) (m3).
- 4412.91.31.30 With a face ply of sen (Kalopanax spp.) (m3).
- 4412.91.31.40 With a face ply of mahogany (Swietenia spp. or Khaya spp.) (m3).
- 4412.91.31.50 Panels not exceeding in any dimension 3.6 mm in thickness, 1.2 m in width, and 2.2 m in length (m3).
- 4412.91.31.60 Other, not surface covered (under: Other) (m3).
- 4412.91.31.70 Other (under: Other) (m3).
- 4412.91.41.00 Other (under: Plywood) (m3): General 8%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 4412.91.51 Other (under: Other): General Free; Special none; Column 2 40%.
- 4412.91.51.05 Wood flooring (under: Other) (m3).
- 4412.91.51.15 Other (under: Other) (m3).
- 4412.92 Other, with at least one outer ply of nonconiferous wood.
- 4412.92.07.00 Containing at least one layer of particle board (m3): General Free; Special none; Column 2 40%.
- 4412.92.11 With a face ply of birch (Betula spp.): General Free; Special none; Column 2 50%.
- 4412.92.11.20 Panels not exceeding in any dimension 3.6 mm in thickness, 1.2 m in width and 2.2 m in length (m3).
- 4412.92.11.30 Not surface covered (under: Other) (m3).
- 4412.92.11.40 Other (under: Other) (m3).
- 4412.92.31 Other (under: Not surface covered, or surface covered with a clear or transparent material which does not obscure the grain, texture or markings of the face ply): General 8%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 4412.92.31.20 With a face ply of walnut (Juglans spp.) (m3).
- 4412.92.31.50 Panels not exceeding in any dimension 3.6 mm in thickness, 1.2 m in width, and 2.2 m in length (m3).
- 4412.92.31.60 Other, not surface covered (under: Other) (m3).
- 4412.92.31.70 Other (under: Other) (m3).
- 4412.92.42.00 Other (under: Plywood) (m3): General 8%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 4412.92.52 Other (under: Other): General Free; Special none; Column 2 40%.
- 4412.92.52.05 Wood flooring (under: Other) (m3).
- 4412.92.52.15 Other (under: Other) (m3).
- 4412.99 Other, with both outer plies of coniferous wood.
- 4412.99.58.00 Containing at least one layer of particle board (m3): General Free; Special none; Column 2 40%.
- 4412.99.61.00 With a face ply of Parana pine (Araucaria angustifolia) (m3): General Free; Special none; Column 2 40%.
- 4412.99.71.00 With a face ply of European red pine (Pinus silvestris) (m3): General 3.4%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 4412.99.81.00 Other (under: Not surface covered, or surface covered with a clear or transparent material which does not obscure the grain, texture or markings of the face ply) (m3): General 8%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 4412.99.91.00 Other (under: Plywood) (m3): General 5.1%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 40%.
- 4412.99.97.00 Other (under: Other) (m3): General Free; Special none; Column 2 40%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.