HTS Heading 4411

Fiberboard of wood or other ligneous materials, whether or not bonded with resins or other organic substances

All 36 HTS codes under heading 4411 (fiberboard of wood), with their duty rates from the 2026 HTS Revision 23. General duty Free to 6%, some per unit.

Every line of heading 4411

  • 4411 Fiberboard of wood or other ligneous materials, whether or not bonded with resins or other organic substances.
  • 4411.12 Of a thickness not exceeding 5 mm.
  • 4411.12.10.00 Not mechanically worked or surface covered (m3): General Free; Special none; Column 2 30%.
  • 4411.12.20.00 Laminated boards bonded in whole or in part, or impregnated, with synthetic resins (kg, m3): General 1.9¢/kg + 1.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 33¢/kg + 25%.
  • 4411.12.30.00 Other (under: Tongued, grooved or rabbetted continuously along any of its edges and dedicated for use in the construction of walls, ceilings or other parts of buildings) (m3): General Free; Special none; Column 2 20%.
  • 4411.12.60.00 Not surface covered (except for oil treatment) (m3): General Free; Special none; Column 2 30%.
  • 4411.12.90 Other (under: Other): General 3.9%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
  • 4411.12.90.10 Standard wood molding (under: Other) (m3).
  • 4411.12.90.90 Other (under: Other) (m3).
  • 4411.13 Of a thickness exceeding 5 mm but not exceeding 9 mm.
  • 4411.13.10.00 Not mechanically worked or surface covered (m3): General Free; Special none; Column 2 30%.
  • 4411.13.20.00 Laminated boards bonded in whole or in part, or impregnated, with synthetic resins (kg, m3): General 1.9¢/kg + 1.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 33¢/kg + 25%.
  • 4411.13.30.00 Other (under: Tongued, grooved or rabbetted continuously along any of its edges and dedicated for use in the construction of walls, ceilings or other parts of buildings) (m3): General Free; Special none; Column 2 20%.
  • 4411.13.60.00 Not surface covered (except for oil treatment) (m3): General Free; Special none; Column 2 30%.
  • 4411.13.90 Other (under: Other): General 3.9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
  • 4411.13.90.10 Standard wood molding (under: Other) (m3).
  • 4411.13.90.90 Other (under: Other) (m3).
  • 4411.14 Of a thickness exceeding 9 mm.
  • 4411.14.10.00 Not mechanically worked or surface covered (m3): General Free; Special none; Column 2 30%.
  • 4411.14.20.00 Laminated boards bonded in whole or in part, or impregnated, with synthetic resins (kg, m3): General 1.9¢/kg + 1.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 33¢/kg + 25%.
  • 4411.14.30.00 Other (under: Tongued, grooved or rabbetted continuously along any of its edges and dedicated for use in the construction of walls, ceilings or other parts of buildings) (m3): General Free; Special none; Column 2 20%.
  • 4411.14.60.00 Not surface covered (except for oil treatment) (m3): General Free; Special none; Column 2 30%.
  • 4411.14.90 Other (under: Other): General 3.9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
  • 4411.14.90.10 Standard wood molding (under: Other) (m3).
  • 4411.14.90.90 Other (under: Other) (m3).
  • 4411.92 Of a density exceeding 0.8 g/cm3.
  • 4411.92.10.00 Not mechanically worked or surface covered (m3): General Free; Special none; Column 2 30%.
  • 4411.92.20.00 Not surface covered (except for oil treatment) (m3): General Free; Special none; Column 2 30%.
  • 4411.92.30.00 Tileboard which has been continuously worked along any of its edges and is dedicated for use in the construction of walls, ceilings or other parts of buildings (m3): General Free; Special none; Column 2 20%.
  • 4411.92.40.00 Other (under: Other) (m3): General 6%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
  • 4411.93 Of a density exceeding 0.5 g/cm3 but not exceeding 0.8 g/cm3.
  • 4411.93.10.00 Not mechanically worked or surface covered (m3): General Free; Special none; Column 2 30%.
  • 4411.93.20.00 Laminated boards bonded in whole or in part, or impregnated, with synthetic resins (kg, m3): General 1.9¢/kg + 1.5%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 33¢/kg + 25%.
  • 4411.93.30.00 Other (under: Tongued, grooved or rabbetted continuously along any of its edges and dedicated for use in the construction of walls, ceilings or other parts of buildings) (m3): General Free; Special none; Column 2 20%.
  • 4411.93.60.00 Not surface covered (except for oil treatment) (m3): General Free; Special none; Column 2 30%.
  • 4411.93.90 Other (under: Other): General 3.9%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 45%.
  • 4411.93.90.10 Standard wood molding (under: Other) (m3).
  • 4411.93.90.90 Other (under: Other) (m3).
  • 4411.94.00 Of a density not exceeding 0.5 g/cm3: General Free; Special none; Column 2 20%.
  • 4411.94.00.10 Impregnated with bitumen (under: Not mechanically worked or surface covered) (m3).
  • 4411.94.00.20 Other (under: Not mechanically worked or surface covered) (m3).
  • 4411.94.00.30 Impregnated with bitumen (under: Other) (m3).
  • 4411.94.00.40 Other (under: Other) (m3).
  • 4411.94.00.50 Impregnated with bitumen (under: Not mechanically worked or surface covered) (m3).
  • 4411.94.00.60 Other (under: Not mechanically worked or surface covered) (m3).
  • 4411.94.00.70 Impregnated with bitumen (under: Other) (m3).
  • 4411.94.00.80 Other (under: Other) (m3).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.