HTS Heading 4415

Packing cases, boxes, crates, drums and similar packings, of wood; cable-drums, of wood; pallets, box-pallets and other load boards, of wood; pallet collars of wood

All 5 HTS codes under heading 4415 (packing cases, boxes, crates), with their duty rates from the 2026 HTS Revision 23. General duty Free to 10.7%.

Every line of heading 4415

  • 4415 Packing cases, boxes, crates, drums and similar packings, of wood; cable-drums, of wood; pallets, box-pallets and other load boards, of wood; pallet collars of wood.
  • 4415.10 Cases, boxes, crates, drums and similar packings; cable-drums.
  • 4415.10.30.00 Packing boxes and cases with solid sides, lids and bottoms (No.): General Free; Special none; Column 2 15%.
  • 4415.10.60.00 Containers designed for use in the harvesting of fruits and vegetables (No.): General Free; Special none; Column 2 Free.
  • 4415.10.90.00 Other (under: Cases, boxes, crates, drums and similar packings; cable-drums) (No.): General 10.7%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 33 1/3%.
  • 4415.20 Pallets, box-pallets and other load boards; pallet collars.
  • 4415.20.40.00 Containers designed for use in the harvesting of fruits and vegetables (No.): General Free; Special none; Column 2 Free.
  • 4415.20.80.00 Other (under: Pallets, box-pallets and other load boards; pallet collars) (No.): General 10.7%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 33 1/3%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.