HTS Heading 4416

Casks, barrels, vats, tubs and other coopers' products and parts thereof, of wood, including staves

All 10 HTS codes under heading 4416 (casks, barrels, vats), with their duty rates from the 2026 HTS Revision 23. General duty Free to 3.2%.

Every line of heading 4416

  • 4416.00 Casks, barrels, vats, tubs and other coopers' products and parts thereof, of wood, including staves.
  • 4416.00.30 Casks, barrels and hogsheads (under: Casks, barrels, vats, tubs and other coopers' products and parts thereof, of wood, including staves): General Free; Special none; Column 2 15%.
  • 4416.00.30.10 New (under: Casks, barrels and hogsheads) (No.).
  • 4416.00.30.20 Assembled (set up) (under: Used) (No.).
  • 4416.00.30.30 Unassembled (knocked down) (under: Used) (No.).
  • 4416.00.60 Staves and hoops; tight barrelheads of softwood: General Free; Special none; Column 2 Free.
  • 4416.00.60.10 Staves (under: New) (No.).
  • 4416.00.60.20 Hoops (under: New) (No.).
  • 4416.00.60.30 Tight barrelheads (under: New) (No.).
  • 4416.00.60.40 Staves (under: Used) (No.).
  • 4416.00.60.50 Other (under: Used) (No.).
  • 4416.00.90 Other (under: Casks, barrels, vats, tubs and other coopers' products and parts thereof, of wood, including staves): General 3.2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 33 1/3%.
  • 4416.00.90.20 New (under: Other) (kg).
  • 4416.00.90.40 Used (under: Other) (kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.