HTS Heading 4417

Tools, tool bodies, tool handles, broom or brush bodies and handles, of wood; boot or shoe lasts and trees, of wood

All 5 HTS codes under heading 4417 (tools, tool bodies, tool handles), with their duty rates from the 2026 HTS Revision 23. General duty Free to 5.1%.

Every line of heading 4417

  • 4417.00 Tools, tool bodies, tool handles, broom or brush bodies and handles, of wood; boot or shoe lasts and trees, of wood.
  • 4417.00.20.00 Broom and mop handles, 1.9 cm or more in diameter and 97 cm or more in length (No.): General Free; Special none; Column 2 33 1/3%.
  • 4417.00.40.00 Paint brush and paint roller handles (kg): General Free; Special none; Column 2 33 1/3%.
  • 4417.00.60.00 Brush backs (under: Tools, tool bodies, tool handles, broom or brush bodies and handles, of wood; boot or shoe lasts and trees, of wood) (No.): General Free; Special none; Column 2 33 1/3%.
  • 4417.00.80 Other (under: Tools, tool bodies, tool handles, broom or brush bodies and handles, of wood; boot or shoe lasts and trees, of wood): General 5.1%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 33 1/3%.
  • 4417.00.80.10 Tool handles (under: Other) (kg).
  • 4417.00.80.90 Other (under: Other) (kg).

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.