HTS Heading 4419

Tableware and kitchenware, of wood

All 8 HTS codes under heading 4419 (tableware and kitchenware, of wood), with their duty rates from the 2026 HTS Revision 23. General duty 3.2% to 5.3%.

Every line of heading 4419

  • 4419 Tableware and kitchenware, of wood.
  • 4419.11.00.00 Bread boards, chopping boards and similar boards (No.): General 3.2%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 33 1/3%.
  • 4419.12.00.00 Chopsticks (under: Of bamboo) (kg): General 3.2%; Special Free (A,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 33 1/3%.
  • 4419.19 Other (under: Of bamboo).
  • 4419.19.10.00 Forks and spoons (under: Other) (kg): General 5.3%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 33 1/3%.
  • 4419.19.90.00 Other (under: Other) (kg): General 3.2%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 33 1/3%.
  • 4419.20 Of tropical wood (under: Tableware and kitchenware, of wood).
  • 4419.20.10.00 Forks and spoons (under: Of tropical wood) (kg): General 5.3%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 33 1/3%.
  • 4419.20.90.00 Other (under: Of tropical wood) (kg): General 3.2%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 33 1/3%.
  • 4419.90 Other (under: Tableware and kitchenware, of wood).
  • 4419.90.11.00 Forks and spoons (under: Other) (kg): General 5.3%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 33 1/3%.
  • 4419.90.91.00 Other (under: Other) (kg): General 3.2%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 33 1/3%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.