HTS Heading 4420

Wood marquetry and inlaid wood; caskets and cases for jewelry or cutlery and similar articles, of wood; statuettes and other ornaments, of wood; wooden articles of furniture not falling within chapter 94

All 8 HTS codes under heading 4420 (wood marquetry and inlaid wood), with their duty rates from the 2026 HTS Revision 23. General duty Free to 4.3%.

Every line of heading 4420

  • 4420 Wood marquetry and inlaid wood; caskets and cases for jewelry or cutlery and similar articles, of wood; statuettes and other ornaments, of wood; wooden articles of furniture not falling within chapter 94.
  • 4420.11.00 Of tropical wood (under: Statuettes and other ornaments): General 3.2%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 33 1/3%.
  • 4420.11.00.10 Of mango wood (Mangifera spp.) (No.).
  • 4420.11.00.30 Of teak (Tectona spp.) (under: Of tropical wood) (No.).
  • 4420.11.00.90 Other (under: Of tropical wood) (No.).
  • 4420.19.00.00 Other (under: Statuettes and other ornaments) (No.): General 3.2%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 33 1/3%.
  • 4420.90 Other (under: Wood marquetry and inlaid wood; caskets and cases for jewelry or cutlery and similar articles, of wood; statuettes and other ornaments, of wood; wooden articles of furniture not falling within chapter 94).
  • 4420.90.20.00 Cigar and cigarette boxes (under: Jewelry boxes, silverware chests, cigar and cigarette boxes, microscope cases, tool or utensil cases and similar boxes, cases and chests, all the foregoing of wood) (No.): General Free; Special none; Column 2 60%.
  • 4420.90.45.00 Not lined with textile fabrics (No.): General 4.3%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 33 1/3%.
  • 4420.90.65.00 Lined with textile fabrics (under: Other) (kg, No.): General Free; Special none; Column 2 11¢/kg + 20%.
  • 4420.90.80.00 Other (under: Other) (No.): General 3.2%; Special Free (A*,AU,BH,CL,CO,D,E,IL,JO,KR,MA,OM,P,PA,PE,S,SG); Column 2 33 1/3%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.