HTS Heading 4706

Pulps of fibers derived from recovered (waste and scrap) paper or paperboard or of other fibrous cellulosic material

All 6 HTS codes under heading 4706 (pulps of fibers derived from recovered), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 4706

  • 4706 Pulps of fibers derived from recovered (waste and scrap) paper or paperboard or of other fibrous cellulosic material.
  • 4706.10.00.00 Cotton linters pulp (under: Pulps of fibers derived from recovered (waste and scrap) paper or paperboard or of other fibrous cellulosic material) (t adw): General Free; Special none; Column 2 Free.
  • 4706.20.00.00 Pulps of fibers derived from recovered (waste and scrap) paper or paperboard (t adw): General Free; Special none; Column 2 Free.
  • 4706.30.00.00 Other, of bamboo (under: Pulps of fibers derived from recovered (waste and scrap) paper or paperboard or of other fibrous cellulosic material) (t adw): General Free; Special none; Column 2 Free.
  • 4706.91.00.00 Mechanical (under: Other) (t adw): General Free; Special none; Column 2 Free.
  • 4706.92.01.00 Chemical (under: Other) (t adw): General Free; Special none; Column 2 Free.
  • 4706.93.01.00 Obtained by a combination of mechanical and chemical processes (t adw): General Free; Special none; Column 2 Free.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.