HTS Heading 4707

Recovered (waste and scrap) paper and paperboard

All 6 HTS codes under heading 4707 (recovered (waste and scrap) paper and paperboard), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 4707

  • 4707 Recovered (waste and scrap) paper and paperboard.
  • 4707.10.00.00 Unbleached kraft paper or paperboard or corrugated paper or paperboard (t): General Free; Special none; Column 2 Free.
  • 4707.20.00 Other paper or paperboard, made mainly of bleached chemical pulp, not colored in the mass: General Free; Special none; Column 2 Free.
  • 4707.20.00.20 High-grade deinking paper and paperboard (t).
  • 4707.20.00.40 Other (under: Other paper or paperboard, made mainly of bleached chemical pulp, not colored in the mass) (t).
  • 4707.30.00 Paper or paperboard made mainly of mechanical pulp (for example, newspapers, journals and similar printed matter): General Free; Special none; Column 2 Free.
  • 4707.30.00.20 Newsprint (under: Paper or paperboard made mainly of mechanical pulp (for example, newspapers, journals and similar printed matter)) (t).
  • 4707.30.00.40 Other (under: Paper or paperboard made mainly of mechanical pulp (for example, newspapers, journals and similar printed matter)) (t).
  • 4707.90.00.00 Other, including unsorted waste and scrap (t): General Free; Special none; Column 2 Free.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.