HTS Heading 4801
Newsprint, in rolls or sheets
All 2 HTS codes under heading 4801 (newsprint, in rolls or sheets), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 4801
- 4801.00.01 Newsprint, in rolls or sheets: General Free; Special none; Column 2 Free.
- 4801.00.01.20 Standard newsprint paper (under: Newsprint, in rolls or sheets) (t).
- 4801.00.01.40 Other (under: Newsprint, in rolls or sheets) (t).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.