HTS Heading 4802

Uncoated paper and paperboard, of a kind used for writing, printing or other graphic purposes, and non perforated punch-cards and punch tape paper, in rolls or rectangular (including square) sheets, of any size, other than paper of heading 4801 or 4803; hand-made paper and paperboard

All 56 HTS codes under heading 4802 (uncoated paper and paperboard), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 4802

  • 4802 Uncoated paper and paperboard, of a kind used for writing, printing or other graphic purposes, and non perforated punch-cards and punch tape paper, in rolls or rectangular (including square) sheets, of any size, other than paper of heading 4801 or 4803; hand-made paper and paperboard.
  • 4802.10.00.00 Handmade paper and paperboard (kg): General Free; Special none; Column 2 17.5%.
  • 4802.20 Paper and paperboard of a kind used as a base for photo-sensitive, heat-sensitive or electro-sensitive paper or paperboard.
  • 4802.20.10.00 In strips or rolls of a width exceeding 15 cm or in rectangular (including square) sheets with one side exceeding 36 cm and the other side exceeding 15 cm in the unfolded state (m²): General Free; Special none; Column 2 20%.
  • 4802.20.20.00 Basic paper to be sensitized for use in photography (kg, m²): General Free; Special none; Column 2 5%.
  • 4802.20.40 Other (under: Other): General Free; Special none; Column 2 30%.
  • 4802.20.40.20 Containing by weight 25 percent or more cotton fiber (kg).
  • 4802.20.40.40 Other (under: Other) (kg).
  • 4802.40.00.00 Wallpaper base (hanging paper) (kg): General Free; Special none; Column 2 10%.
  • 4802.54 Weighing less than 40 g/m² (under: Other paper and paperboard, not containing fibers obtained by a mechanical or chemi-mechanical process or of which not more than 10 percent by weight of the total fiber content consists of such fibers).
  • 4802.54.10.00 Writing paper (under: In strips or rolls of a width exceeding 15 cm or in rectangular (including square) sheets with one side exceeding 36 cm and the other side exceeding 15 cm in the unfolded state) (kg): General Free; Special none; Column 2 28%.
  • 4802.54.20.00 India and bible paper (under: In strips or rolls of a width exceeding 15 cm or in rectangular (including square) sheets with one side exceeding 36 cm and the other side exceeding 15 cm in the unfolded state) (kg): General Free; Special none; Column 2 18%.
  • 4802.54.31.00 Other (under: In strips or rolls of a width exceeding 15 cm or in rectangular (including square) sheets with one side exceeding 36 cm and the other side exceeding 15 cm in the unfolded state) (kg): General Free; Special none; Column 2 11.5%.
  • 4802.54.50.00 Basic paper to be sensitized for use in photography (kg, m2): General Free; Special none; Column 2 5%.
  • 4802.54.61.00 Other (under: Other) (kg): General Free; Special none; Column 2 30%.
  • 4802.55 Weighing 40 g/m² or more but not more than 150 g/m², in rolls.
  • 4802.55.10.00 Writing and cover paper (under: Of a width exceeding 15 cm) (kg): General Free; Special none; Column 2 28%.
  • 4802.55.20.00 Drawing paper (under: Of a width exceeding 15 cm) (kg): General Free; Special none; Column 2 15.5%.
  • 4802.55.30.00 India and bible paper (under: Of a width exceeding 15 cm) (kg): General Free; Special none; Column 2 18%.
  • 4802.55.40.00 Other (under: Of a width exceeding 15 cm) (kg): General Free; Special none; Column 2 11.5%.
  • 4802.55.60.00 Basic paper to be sensitized for use in photography (kg, m²): General Free; Special none; Column 2 5%.
  • 4802.55.70 Other (under: Other): General Free; Special none; Column 2 30%.
  • 4802.55.70.20 Containing by weight 25 percent or more cotton fiber (kg).
  • 4802.55.70.40 Other (under: Other) (kg).
  • 4802.56 Weighing 40 g/m² or more but not more than 150 g/m², in sheets with one side not exceeding 435 mm and the other side not exceeding 297 mm in the unfolded state.
  • 4802.56.10.00 Writing and cover paper (under: With one side exceeding 360 mm and the other side exceeding 150 mm in the unfolded state) (kg): General Free; Special none; Column 2 28%.
  • 4802.56.20.00 Drawing paper (under: With one side exceeding 360 mm and the other side exceeding 150 mm in the unfolded state) (kg): General Free; Special none; Column 2 15.5%.
  • 4802.56.30.00 India and bible paper (under: With one side exceeding 360 mm and the other side exceeding 150 mm in the unfolded state) (kg): General Free; Special none; Column 2 18%.
  • 4802.56.40.00 Other (under: With one side exceeding 360 mm and the other side exceeding 150 mm in the unfolded state) (kg): General Free; Special none; Column 2 11.5%.
  • 4802.56.60.00 Basic paper to be sensitized for use in photography (kg, m²): General Free; Special none; Column 2 5%.
  • 4802.56.70 Other (under: Other): General Free; Special none; Column 2 30%.
  • 4802.56.70.20 Containing by weight 25 percent or more cotton fiber (kg).
  • 4802.56.70.50 Writing and cover paper (under: Other) (kg).
  • 4802.56.70.90 Other (under: Other) (kg).
  • 4802.57 Other, weighing 40 g/m² or more but not more than 150 g/m².
  • 4802.57.10 Writing and cover paper (under: Other, weighing 40 g/m² or more but not more than 150 g/m²): General Free; Special none; Column 2 28%.
  • 4802.57.10.40 With one side equal to 965 mm and the other side equal to 635 mm in the unfolded state (kg).
  • 4802.57.10.85 Other (under: Writing and cover paper) (kg).
  • 4802.57.20.00 Drawing paper (under: Other, weighing 40 g/m² or more but not more than 150 g/m²) (kg): General Free; Special none; Column 2 15.5%.
  • 4802.57.30.00 India and bible paper (under: Other, weighing 40 g/m² or more but not more than 150 g/m²) (kg): General Free; Special none; Column 2 18%.
  • 4802.57.40 Other (under: Other, weighing 40 g/m² or more but not more than 150 g/m²): General Free; Special none; Column 2 11.5%.
  • 4802.57.40.40 With one side equal to 965 mm and the other side equal to 635 mm in the unfolded state (kg).
  • 4802.57.40.85 Other (under: Other) (kg).
  • 4802.58 Weighing more than 150 g/m² (under: Other paper and paperboard, not containing fibers obtained by a mechanical or chemi-mechanical process or of which not more than 10 percent by weight of the total fiber content consists of such fibers).
  • 4802.58.10.00 Writing and cover paper (under: In strips or rolls of a width exceeding 15 cm or in rectangular (including square) sheets with one side exceeding 36 cm and the other side exceeding 15 cm in the unfolded state) (kg): General Free; Special none; Column 2 30%.
  • 4802.58.20 Other (under: In strips or rolls of a width exceeding 15 cm or in rectangular (including square) sheets with one side exceeding 36 cm and the other side exceeding 15 cm in the unfolded state): General Free; Special none; Column 2 24.5%.
  • 4802.58.20.20 Drawing paper (under: Other) (kg).
  • 4802.58.20.40 Bristols (under: Other) (kg).
  • 4802.58.20.80 Other (under: Other) (kg).
  • 4802.58.50.00 Basic paper to be sensitized for use in photography (kg, m²): General Free; Special none; Column 2 5%.
  • 4802.58.60 Other (under: Other): General Free; Special none; Column 2 30%.
  • 4802.58.60.20 Containing by weight 25 percent or more cotton fiber (kg).
  • 4802.58.60.40 Other (under: Other) (kg).
  • 4802.61 In rolls (under: Other paper and paperboard, of which more than 10 percent by weight of the total fiber content consists of fibers obtained by a mechanical or chemi-mechanical process).
  • 4802.61.10.00 Writing and cover paper (under: Of a width exceeding 15 cm) (kg): General Free; Special none; Column 2 28%.
  • 4802.61.20.00 Drawing paper (under: Of a width exceeding 15 cm) (kg): General Free; Special none; Column 2 15.5%.
  • 4802.61.31 Other (under: Of a width exceeding 15 cm): General Free; Special none; Column 2 11.5%.
  • 4802.61.31.10 Weighing less than 40 g/m2 (under: Other) (kg).
  • 4802.61.31.35 Supercalendered (under: Other) (kg).
  • 4802.61.31.91 Other (under: Other) (kg).
  • 4802.61.50.00 Basic paper to be sensitized for use in photography (kg, m²): General Free; Special none; Column 2 5%.
  • 4802.61.60 Other (under: Other): General Free; Special none; Column 2 30%.
  • 4802.61.60.20 Containing by weight 25 percent or more cotton fiber (kg).
  • 4802.61.60.40 Other (under: Other) (kg).
  • 4802.62 In sheets with one side not exceeding 435 mm and the other side not exceeding 297 mm in the unfolded state.
  • 4802.62.10.00 Writing and cover paper (under: With one side exceeding 360 mm and the other side exceeding 150 mm in the unfolded state) (kg): General Free; Special none; Column 2 28%.
  • 4802.62.20.00 Drawing paper (under: With one side exceeding 360 mm and the other side exceeding 150 mm in the unfolded state) (kg): General Free; Special none; Column 2 15.5%.
  • 4802.62.30.00 Other (under: With one side exceeding 360 mm and the other side exceeding 150 mm in the unfolded state) (kg): General Free; Special none; Column 2 11.5%.
  • 4802.62.50.00 Basic paper to be sensitized for use in photography (kg, m²): General Free; Special none; Column 2 5%.
  • 4802.62.61 Other (under: Other): General Free; Special none; Column 2 30%.
  • 4802.62.61.20 Containing by weight 25 percent or more cotton fiber (kg).
  • 4802.62.61.40 Other (under: Other) (kg).
  • 4802.69 Other (under: Other paper and paperboard, of which more than 10 percent by weight of the total fiber content consists of fibers obtained by a mechanical or chemi-mechanical process).
  • 4802.69.10.00 Writing and cover paper (under: Other) (kg): General Free; Special none; Column 2 28%.
  • 4802.69.20.00 Drawing paper (under: Other) (kg): General Free; Special none; Column 2 15.5%.
  • 4802.69.30.00 Other (under: Other) (kg): General Free; Special none; Column 2 11.5%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.