HTS Heading 4803
Toilet or facial tissue stock, towel or napkin stock and similar paper of a kind used for household or sanitary purposes, cellulose wadding and webs of cellulose fibers, whether or not creped, crinkled, embossed, perforated, surface-colored, surface decorated or printed, in rolls or sheets
All 2 HTS codes under heading 4803 (toilet or facial tissue stock), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 4803
- 4803.00 Toilet or facial tissue stock, towel or napkin stock and similar paper of a kind used for household or sanitary purposes, cellulose wadding and webs of cellulose fibers, whether or not creped, crinkled, embossed, perforated, surface-colored, surface decorated or printed, in rolls or sheets.
- 4803.00.20.00 Cellulose wadding (under: Toilet or facial tissue stock, towel or napkin stock and similar paper of a kind used for household or sanitary purposes, cellulose wadding and webs of cellulose fibers, whether or not creped, crinkled, embossed, perforated, surface-colored, surface decorated or printed, in rolls or sheets) (kg): General Free; Special none; Column 2 24%.
- 4803.00.40.00 Other (under: Toilet or facial tissue stock, towel or napkin stock and similar paper of a kind used for household or sanitary purposes, cellulose wadding and webs of cellulose fibers, whether or not creped, crinkled, embossed, perforated, surface-colored, surface decorated or printed, in rolls or sheets) (kg): General Free; Special none; Column 2 36%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.