HTS Heading 4804

Uncoated kraft paper and paperboard, in rolls or sheets, other than that of heading 4802 or 4803

All 30 HTS codes under heading 4804 (uncoated kraft paper and paperboard), with their duty rates from the 2026 HTS Revision 23. General duty Free.

Every line of heading 4804

  • 4804 Uncoated kraft paper and paperboard, in rolls or sheets, other than that of heading 4802 or 4803.
  • 4804.11.00.00 Unbleached (under: Kraftliner) (kg): General Free; Special none; Column 2 20%.
  • 4804.19.00.00 Other (under: Kraftliner) (kg): General Free; Special none; Column 2 20%.
  • 4804.21.00.00 Unbleached (under: Sack kraft paper) (kg): General Free; Special none; Column 2 30%.
  • 4804.29.00.00 Other (under: Sack kraft paper) (kg): General Free; Special none; Column 2 30%.
  • 4804.31 Unbleached (under: Other kraft paper and paperboard weighing 150 g/m² or less).
  • 4804.31.10.00 Weighing over 15 g/m² but not over 30 g/m² (kg): General Free; Special none; Column 2 20.5%.
  • 4804.31.20.00 Other (under: Condenser paper) (kg): General Free; Special none; Column 2 25%.
  • 4804.31.40 Wrapping paper (under: Unbleached): General Free; Special none; Column 2 30%.
  • 4804.31.40.20 Bag or sack paper (under: Wrapping paper) (kg).
  • 4804.31.40.40 Other (under: Wrapping paper) (kg).
  • 4804.31.60.00 Other (under: Unbleached) (kg): General Free; Special none; Column 2 30%.
  • 4804.39 Other (under: Other kraft paper and paperboard weighing 150 g/m² or less).
  • 4804.39.20.00 Condenser paper (under: Other) (kg): General Free; Special none; Column 2 25%.
  • 4804.39.40 Wrapping paper (under: Other): General Free; Special none; Column 2 30%.
  • 4804.39.40.20 Bag or sack paper (under: Wrapping paper) (kg).
  • 4804.39.40.41 Tissue paper having a basis weight not exceeding 29 g/m², in sheets (kg).
  • 4804.39.40.49 Other (under: Other) (kg).
  • 4804.39.60 Other (under: Other): General Free; Special none; Column 2 30%.
  • 4804.39.60.20 Base stock for trays, dishes, plates, cups and the like (kg).
  • 4804.39.60.40 Other (under: Other) (kg).
  • 4804.41 Unbleached (under: Other kraft paper and paperboard weighing more than 150 g/m² but less than 225 g/m²).
  • 4804.41.20.00 Wrapping paper (under: Unbleached) (kg): General Free; Special none; Column 2 30%.
  • 4804.41.40.00 Other (under: Unbleached) (kg): General Free; Special none; Column 2 30%.
  • 4804.42.00 Bleached uniformly throughout the mass and of which more than 95 percent by weight of the total fiber content consists of wood fibers obtained by a chemical process: General Free; Special none; Column 2 30%.
  • 4804.42.00.10 Base stock for milk cartons and other beverage containers (kg).
  • 4804.42.00.20 Folding carton stock (under: Other) (kg).
  • 4804.42.00.30 Base stock for trays, dishes, plates, cups and the like (kg).
  • 4804.42.00.40 Base stock for packaging (under: Other) (kg).
  • 4804.42.00.50 Other (under: Other) (kg).
  • 4804.49.00.00 Other (under: Other kraft paper and paperboard weighing more than 150 g/m² but less than 225 g/m²) (kg): General Free; Special none; Column 2 30%.
  • 4804.51.00.00 Unbleached (under: Other kraft paper and paperboard weighing 225 g/m² or more) (kg): General Free; Special none; Column 2 30%.
  • 4804.52.00 Bleached uniformly throughout the mass and of which more than 95 percent by weight of the total fiber content consists of wood fibers obtained by a chemical process: General Free; Special none; Column 2 30%.
  • 4804.52.00.10 Base stock for milk cartons and other beverage containers (kg).
  • 4804.52.00.20 Folding carton stock (under: Other) (kg).
  • 4804.52.00.30 Base stock for trays, dishes, plates, cups and the like (kg).
  • 4804.52.00.40 Base stock for packaging (under: Other) (kg).
  • 4804.52.00.50 Other (under: Other) (kg).
  • 4804.59.00.00 Other (under: Other kraft paper and paperboard weighing 225 g/m² or more) (kg): General Free; Special none; Column 2 30%.

About these rates

The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.

Last reviewed 2026-11-12.