HTS Heading 4805
Other uncoated paper and paperboard, in rolls or sheets, not further worked or processed than as specified in note 3 to this chapter
All 30 HTS codes under heading 4805 (other uncoated paper and paperboard), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 4805
- 4805 Other uncoated paper and paperboard, in rolls or sheets, not further worked or processed than as specified in note 3 to this chapter.
- 4805.11.00.00 Semichemical fluting paper (under: Fluting paper) (kg): General Free; Special none; Column 2 30%.
- 4805.12 Straw fluting paper (under: Fluting paper).
- 4805.12.10.00 Weighing 150 g/m² or less (under: Straw fluting paper) (kg): General Free; Special none; Column 2 30%.
- 4805.12.20.00 Weighing over 150 g/m² (under: Straw fluting paper) (kg): General Free; Special none; Column 2 30%.
- 4805.19 Other (under: Fluting paper).
- 4805.19.10.00 Weighing 150 g/m² or less (under: Other) (kg): General Free; Special none; Column 2 30%.
- 4805.19.20.00 Weighing over 150 g/m² (under: Other) (kg): General Free; Special none; Column 2 30%.
- 4805.24 Weighing 150 g/m² or less (under: Testliner (recycled liner board)).
- 4805.24.50.00 Weighing not over 15 g/m² (under: Weighing 150 g/m² or less) (kg): General Free; Special none; Column 2 30%.
- 4805.24.70.00 Weighing over 15 g/m² but not over 30 g/m² (kg): General Free; Special none; Column 2 11¢/kg + 15%.
- 4805.24.90.00 Weighing over 30 g/m² (under: Weighing 150 g/m² or less) (kg): General Free; Special none; Column 2 30%.
- 4805.25.00.00 Weighing more than 150 g/m² (under: Testliner (recycled liner board)) (kg): General Free; Special none; Column 2 30%.
- 4805.30.00.00 Sulfite wrapping paper (under: Other uncoated paper and paperboard, in rolls or sheets, not further worked or processed than as specified in note 3 to this chapter) (kg): General Free; Special none; Column 2 30%.
- 4805.40.00.00 Filter paper and paperboard (under: Other uncoated paper and paperboard, in rolls or sheets, not further worked or processed than as specified in note 3 to this chapter) (kg): General Free; Special none; Column 2 11¢/kg + 15%.
- 4805.50.00.00 Felt paper and paperboard (under: Other uncoated paper and paperboard, in rolls or sheets, not further worked or processed than as specified in note 3 to this chapter) (kg): General Free; Special none; Column 2 10%.
- 4805.91 Weighing 150 g/m² or less (under: Other).
- 4805.91.10 Multi-ply paper and paperboard; bibulous and wrapping paper: General Free; Special none; Column 2 30%.
- 4805.91.10.10 Folding carton board (under: Multi-ply paper and paperboard; bibulous and wrapping paper) (kg).
- 4805.91.10.90 Other (under: Multi-ply paper and paperboard; bibulous and wrapping paper) (kg).
- 4805.91.20.00 Condenser paper (under: Weighing 150 g/m² or less) (kg): General Free; Special none; Column 2 25%.
- 4805.91.50.00 Weighing not over 15 g/m² (under: Other) (kg): General Free; Special none; Column 2 30%.
- 4805.91.70.00 Weighing over 15 g/m² but not over 30 g/m² (kg): General Free; Special none; Column 2 11¢/kg + 15%.
- 4805.91.90.00 Weighing over 30 g/m² (under: Other) (kg): General Free; Special none; Column 2 30%.
- 4805.92 Weighing more than 150 g/m² but less than 225 g/m².
- 4805.92.20.00 Pressboard (under: Weighing more than 150 g/m² but less than 225 g/m²) (kg): General Free; Special none; Column 2 30%.
- 4805.92.40 Other (under: Weighing more than 150 g/m² but less than 225 g/m²): General Free; Special none; Column 2 30%.
- 4805.92.40.10 Folding carton board (under: Other) (kg).
- 4805.92.40.20 Construction paper (under: Other) (kg).
- 4805.92.40.30 Linerboard containing by weight less than 80 percent chemical sulfate wood pulp (kg).
- 4805.92.40.40 Other (under: Other) (kg).
- 4805.93 Weighing 225 g/m² or more (under: Other).
- 4805.93.20.00 Pressboard (under: Weighing 225 g/m² or more) (kg): General Free; Special none; Column 2 30%.
- 4805.93.40 Other (under: Weighing 225 g/m² or more): General Free; Special none; Column 2 30%.
- 4805.93.40.10 Folding carton board (under: Other) (kg).
- 4805.93.40.15 Wet machine board (under: Other) (kg).
- 4805.93.40.20 Construction paper (under: Other) (kg).
- 4805.93.40.30 Linerboard containing by weight less than 80 percent chemical sulfate wood pulp (kg).
- 4805.93.40.50 Tube and core board (under: Other) (kg).
- 4805.93.40.60 Other (under: Other) (kg).
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.