HTS Heading 4806
Vegetable parchment, greaseproof papers, tracing papers and glassine and other glazed transparent or translucent papers, in rolls or sheets
All 4 HTS codes under heading 4806 (vegetable parchment, greaseproof papers), with their duty rates from the 2026 HTS Revision 23. General duty Free.
Every line of heading 4806
- 4806 Vegetable parchment, greaseproof papers, tracing papers and glassine and other glazed transparent or translucent papers, in rolls or sheets.
- 4806.10.00.00 Vegetable parchment (under: Vegetable parchment, greaseproof papers, tracing papers and glassine and other glazed transparent or translucent papers, in rolls or sheets) (kg): General Free; Special none; Column 2 19%.
- 4806.20.00.00 Greaseproof papers (under: Vegetable parchment, greaseproof papers, tracing papers and glassine and other glazed transparent or translucent papers, in rolls or sheets) (kg): General Free; Special none; Column 2 7¢/kg + 15%.
- 4806.30.00.00 Tracing papers (under: Vegetable parchment, greaseproof papers, tracing papers and glassine and other glazed transparent or translucent papers, in rolls or sheets) (kg): General Free; Special none; Column 2 7¢/kg + 15%.
- 4806.40.00.00 Glassine and other glazed transparent or translucent papers (kg): General Free; Special none; Column 2 7¢/kg + 15%.
About these rates
The rates are those printed in the 2026 HTS Revision 23, published by the U.S. International Trade Commission. A 10-digit statistical line takes the rates printed on the 8-digit line above it. Chapter 99 duties (Section 232, Section 301, IEEPA) depend on the product, the origin and the date, are charged on top, and are not included. A code here is a strong lead, not a ruling: confirm it with a customs broker or a CBP binding ruling.
Last reviewed 2026-11-12.